Laserfiche WebLink
- i <br /> _ , <br /> PAGE 2 <br /> Apply two stretch coats of Neo-V2-C with Pennaflex nylon reinforcing to a total � <br /> thickness of approximately 20 Mil. � <br /> Apply Aggregate for non-skid finish. <br /> Appiy Sealer coat of 1910 coating to ali areas. a <br /> Leave all areas neat and Gean, disposing of all debris generated during the course of <br /> this work. <br /> Alt work to be performed, weather permitting, upon average of 50�temperature. -� <br /> All work warranted for one year against defects. <br /> TOTAL MATERIAL AND LABOR: s3,440.45 . <br /> OPTION 2.b.: BASEMENT: INSTALL CEILINGS AND TRIM !N CLASSROOMS <br /> Cover ceiling in classroom with 518"sheet rock, taped and finished. <br /> Install 21/4" pine cove molding to ceiling upon completion. <br /> Tape and finish intermediate office at bottom of stairs only, using existing sheet rodc. <br /> Paint ceiling and molding with one coat of primer and one coat of finish paint. <br />� Leave all areas neat and clean di <br /> , sposing of all debris enerated durin the course of <br /> . 9 9 <br /> this work. <br /> Patch holes in brick walls. <br /> No sales tax is included in this bid. <br /> If painting is not required, deduct $255.00 from TOTAL MATERIAL AND LABOR. <br /> TOTAL MATERI�kL AND LABOR: s2,265.48 <br />