My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R94-63 AUTHORIZING THE EXECUTION OF A CONTRACT FOR NORTH WATER TREATMENT PLANT FEASIBILITY STUDY
COD
>
City Clerk
>
RESOLUTIONS
>
1994
>
R94-63 AUTHORIZING THE EXECUTION OF A CONTRACT FOR NORTH WATER TREATMENT PLANT FEASIBILITY STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2016 4:00:42 PM
Creation date
7/13/2016 4:00:33 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R94-63
Res Ord Title
AUTHORIZING THE EXECUTION OF A CONTRACT FOR NORTH WATER TREATMENT PLANT FEASIBILITY STUDY
Approved Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bruce A. McNabb Page 2 <br /> June 23, 1994 <br /> Scope of Services <br /> Our financial and engineering expertise provides us with a solid foundation to analyze the key <br /> issues of this study. As such, we propose an approach that: (1) identifies engineering <br /> considerations for ADM, (2) identifies alternatives, (3) investigates impacts of viable <br /> alternatives, and (4) makes recommendations to the City with regard to the North WTP. <br /> Task 1: Kick Off and Interim Meetings. Consultation with City staff throughout the <br /> duration of the study is essential to drawing meaningful and accurate conclusions. In addition <br /> to continuous communication throughout the project, Black & Veatch staff will attend kick- <br /> off and interim meetings to collect necessary data and ascertain City policy direction. <br /> Task 2: Identify engineering considerations for ADM. The Environmental division of <br /> Black & Veatch will identify engineering needs for water service to ADM, including: <br /> • Process water quality requirements. <br /> • Fire protection requirements. <br /> • Total capacity needs and the extent to which the North Plant can meet <br /> those needs. <br /> • Illinois Environmental Protection Agency (IEPA) considerations. <br /> • Preliminary indications of the need for ADM to provide sepazate process <br /> and potable water systems. <br /> Task 3: Identify alternatives to the City regarding the North WTP. Black & Veatch will <br /> identify and describe preliminary alternatives available to the City regarding the North WTP, <br /> including: <br /> • Maintaining the status quo. <br /> • Abandoning the plant and expanding the South WTP (including water <br /> transmission and distribution improvements). <br /> • Upgrading the North WTP to meet EPA finished water quality standards <br /> for treating 12 mgd regardless of lake water quality, thus delaying <br /> expansion of the South WTP. <br /> • Selling the North WTP to ADM where ADM operates the plant entirely <br /> and the City charges for lake water. <br /> • Selling the North WTP to ADM where ADM operates the plant entirely <br /> and the City does not charge for lake water. <br /> • Selling the North WTP to ADM where the City operates the plant entirely. <br /> • Upgrading the North WTP to ADM process water quality standards, where <br /> the City owns and operates the plant as a sole source water supplier to <br /> ADM. <br />
The URL can be used to link to this page
Your browser does not support the video tag.