My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R93-126 ACCEPTING THE PROPOSAL AND AUTHORIZING INTER-GOVERNMENTAL AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1993
>
R93-126 ACCEPTING THE PROPOSAL AND AUTHORIZING INTER-GOVERNMENTAL AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 11:07:14 AM
Creation date
7/15/2016 11:07:12 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R93-126
Res Ord Title
ACCEPTING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF AN INTER-GOVERNMENTAL AGREEMENT CITY PROJECT 9027
Approved Date
8/16/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT FOR CONSTRUCTION ENGINEERING SERVICES <br /> FOR <br /> SANITARY DISTRICT OF DECATUR <br /> OAR GROVE INTERCEPTOR REPLACEMENT <br /> THIS AGREEMENT Made at Decatur, Illinois this 18th day of <br /> Auqust, 1993 by and between the Sanitary District of Decatur, herein- <br /> after referred to as "OWNER" and Bainbridge, Gee, Milanski & <br /> Associates, Inc. , 1670 S . Taylorville Rd. , Decatur, Illinois 62521, <br /> hereinafter referred to as "ENGINEER, " WITNESSETH: <br /> The OWNER proposes to engage the ENGINEER to provide profes- <br /> sional services for the Construction Engineering and Resident Inspec- <br /> tion of the Oak Grove Interceptor Replacement, hereinafter referred <br /> to as the PROJECT. <br /> THE ENGINEER AGREES, <br /> 1. Construction Enqineerinq - Furnish services during the <br /> construction period generally comprised of the following: <br /> . a. Consult with the OWNER and with the Contractor on <br /> interpretation of plans and specifications and reg- <br /> arding any changes under consideration as construction <br /> proceeds. <br /> b,. Provide periodical job-site inspection by the Project <br /> Engineer, or his representatives, during the construc- <br /> tion period. <br /> c. Prepare and submit all payment estimates, change or- <br /> ders, records, and reports required by the OWNER. <br /> d. Safeguard the OWNER against defects and deficiencies on <br /> the part of the contractor, but the ENGINEER does not <br /> guarantee the performance of the contract by the con- <br /> tractor. <br /> e. Conduct final inspection of construction and prepare <br /> final papers and reports. <br /> f. Revise contract drawings to show location and nature of <br /> improvement as actually constructed and supply "as <br /> built" drawings consisting of a mylar set and one set <br /> of blue line prints to the OWNER. <br /> g. Inspect the contractor's operations to insure compli- <br /> ance with the plans and specifications and the keeping <br /> of complete project records. <br /> h. Check all shop and working drawings. <br /> BGM 93028A -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.