Laserfiche WebLink
�i , <br /> Illinois Department Final Report, Notice of Completion and <br /> of Transportation Acceptance of Improvement Constructed <br /> Under the Illinois Highway Code <br /> Municipality Decatur The improvement was constructed in accordance with the plans approved by the <br /> Department on or as follows:(describe change) <br /> Counry Macon January 1, 1993 to December 31, 1993 <br /> Road District 5 Length as built Cross Section as built <br /> Sedion 93-09309-00-TL Road Bed Width Surface Type <br /> Contractor Width Thickness ' <br /> Financial Stateme�t I'� <br /> Balance in Authorized <br /> Total Funds Received for Expended For TO BE <br /> Construction Credited to Credited <br /> Engineering Unobligated Unobligated <br /> Source Amount R.O.W. Const. Engr. R.O.W. Balance Balance <br /> MFT 116500.00 116500.00 <br /> City 121.93 121.93 <br /> Totals 116621.93 116621.93 <br /> Use only one line for each source of funds,or purpose. Do not make a separate line for each receipt. <br /> Remarks <br /> Submitted ��- �— p� ❑ County Engineer �/r_� -- <br /> Date �Municipal Engineer �' <br /> Summary <br /> Final inspection of the work designated above was made on Item Cost <br /> and it was found to be completed substantially in accordance with all the require- Contract 116196.46 <br /> ments of the plans,specifications and contract. The financial statement is in Final Contract Cost" 116621.93 <br /> accordance with my records. <br /> � -_L 2-�� <br /> District ngineer of Local Roads&Streets <br /> I recommend acceptance by the Department of Transportation. This improvement <br /> shall henceforth be maintained by the <br /> Total Const.Cost*" 116621.93 <br /> Said improvement is hereby accepted by the Department of Transportation. R.O.W. <br /> Engineering <br /> Approved � �pJ� <br /> D e <br /> Total Cost 116621.93 <br /> Submit to Dist.� Engineer ��� �� ' For Day labor sections use estimated costs here. <br /> 5 copies for Municipal Work District Engineer •' Use actual construction cost regardless Contract <br /> 5 copies for County Work or Day Labor construction. <br /> 6 copies for Road District Work <br /> BLR 7201 (Rev. 12/98) <br />