Laserfiche WebLink
l , , <br /> � ;• <br /> ,` <br /> ���I110LS ��2rtfYlPJlt Final Report, Notice of Completion and <br /> of Transportation Acceptance of Improvement Constructed <br /> Under the Illinois Highway Code <br /> Municipalitv DECATUR The improvement was constructed in accordance with the plans approved by the <br /> Department on or as follows: (describe change) <br /> COUftty MACON ,Tani�ary 1 , 1 992 tn DPc-PmbPr �1 , 1 992 <br /> Road District 5 Lenqth as built Cross Section as built <br /> Section 92-09147-00-TL Road Bed Width Surtace Tvpe <br /> Contractor EGIZII ELECT. Width Thickness <br /> Financial Statement <br />, Balance in Authorized Acct <br /> Totat Funds Received for Expended For TO BE <br /> Construction Credited to Credited <br /> Engineering Unobligated Unobligated <br /> Source Amount R.O.W. Const. Engr. R.O.W. Balance Balance <br /> MFT aao2o.25 $ons.sa <br /> Totals aao2o.25 sons.sa <br /> Use only one line for each source of funds,or purpose. Do not make a separate line for each receipt. <br /> Remarks <br /> Submitted /— �— � �-- ❑ County Engineer ��.---�' <br /> Date � Municipal Engineer <br /> Summary <br /> Final insoer.tinn of thp work desianated ahove wa5 madP nn Item Cost <br /> and it was found to be completed substantially in accordance with all the require- Contract sao2o.25 <br /> ments of the plans, specifications and contract. The financial statement is in Final Contract Cost� aons.sa <br /> accordance with my records. A <br /> v �� <br /> District E inee of Lo I Roads&Streets <br /> I recommend acceptance by the Department of Transportation. This improvement <br /> shall henceforth be maintained by the <br /> Total Const.Cost"" 80776.94 <br /> Said improvement is hereby accepted by the Department of Tr�nspo�tation. R.o.w. <br /> Engineering <br /> Aqproved �1 �� �a� <br /> D te <br /> / Total Cost 80776.94 <br /> Submit to Dist�_ Engineer istrict n ineer l� ' For Day Labor sections use estimated costs here. <br /> 5 copies for Municipal worK 9 •• Use actual construction cost regardless Contract <br /> 5 copies for County Work or Day Labor construction. <br /> 6 copies for Road District Work <br /> BLR 7201 (Rev. 12/98) <br />