Laserfiche WebLink
Page Two <br /> Mr. William B. Sands <br /> � Note: The stipulated sum of $121,596.00 is based on $12,645.00 previously <br /> invoiced for services performed related to the new site and building plus <br /> $108,951.00 for completion of Basic Services related to the new site and <br /> building. <br /> Subparagraph 11.2.2 <br /> Revise the breakdown of the total new additional Basic Service <br /> Compensation as follows: <br /> Schematic Design/Design Development Phase percent 15.3 �16.683.00 <br /> Construction Documents Phase percent 60.0 $65.395.00 <br /> Bidding or Negotiation Phase percent 4.4 4 760.00 <br /> Construction Phase percent 20.3 $22.113.00 <br /> TOTAL 100% $108,951.00 <br /> Subparaaraph 12.1 <br /> Revise the entire subparagraph to read as follows: <br /> Paragraphs contained herein which relate to fees, completion dates, <br /> time schedules,interest rates and similar matters are based on a <br /> construction cost budget of $1,533,000 as presented in WVP's letter to <br /> the Public Transit Administrator,dated March 26, 1991. This does not , <br /> include any demolition on the proposed building site or the existing ��� <br /> transit system facilities. i <br /> Subparaaraph 12.2 I <br /> Delete the entire subparagraph. i <br /> Add Subparaaraph 12.4 <br /> The Owner shall fumish front end specification documents. � <br /> . The Owner shall furnish necessary information to Architect for existing and <br /> future equipment furnished or purchased by Owner for ins#allation in the new <br /> facility. <br /> The Basic Services Compensation does not include preparation of demolition <br /> documents. . <br /> The Basic Services Compensation is based on providing a new fuel <br /> dispensing island served by the existing underground fuel tank. A new ' <br /> underground fuel tank is not included. <br />