My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R93-13 AUTHORIZING ARCHITECHURAL / ENGINEERING AGREEMENT AND AGREEMENT AND MORTGAGE
COD
>
City Clerk
>
RESOLUTIONS
>
1993
>
R93-13 AUTHORIZING ARCHITECHURAL / ENGINEERING AGREEMENT AND AGREEMENT AND MORTGAGE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 3:18:32 PM
Creation date
7/19/2016 3:18:29 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R93-13
Res Ord Title
AUTHORIZING ARCHITECTURAL / ENGINEERING AGREEMENT AND AGREEMENT AND MORTGAGE - ECONOMIC DEVELOPMENT ADMINISTRATION
Approved Date
2/1/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> 3.2 A soils engineer or other consultant, when such services <br /> are deemed necessary includinq reports, test borinq, test pits, <br /> soil bearing values, percolation tests, air and water pollution <br /> tests, ground corrosion and resistivity tests and other necessary <br /> operations for determining sub-soil, air, and water conditions. <br /> Construction testing shall be provided, as necessary, to insure <br /> that the materials and methods furnished by the Contractor(s) are <br /> in conformance with the contract plans and specifications. Such <br /> testing includes, but is not limited to, in-place density tests <br /> on backfill material, gravel gradation analysis, concrete slump <br /> and compression tests, and asphalt material composition tests. <br /> The A/E shall monitor and direct any subsurface explorations when <br /> performed by other than the A/E. <br /> 3.3 Providing special analysis of the Owner�s needs, when <br /> requested by the Owner. <br /> 3.4 Providing financial feasibility or other special studies. <br /> 3.5 Providing planning surveys, site evaluation, or comparative <br /> studies of prospective sites. <br /> 3.6 Providing design services relative to future facilities, <br /> systems, and equipment which are not intended to be constructed <br /> as part of the Project. <br /> 3.7 Providing services to investigate existing conditions or <br /> facilities or make measured drawings thereof, or to verify the <br /> accuracy of drawings or other information furnished by the Owner. <br /> 3.8 Preparing documents for out-of-sequence services requested <br /> by the Owner. <br /> 3.9 Providing interior design and other services required for <br /> or in connection with the selection of furniture and furnishings. <br /> 3.10 Making major revisions in Drawings, Specifications or other <br /> project documents, when such revisions are inconsistent with <br /> written approvals or instructions previously given and are due to <br /> causes beyond the control of the A/E. <br /> 3.11 Preparing supporting data and other services in connection <br /> with Change Orders, when the change is due to causes beyond the <br /> control of the A/E and is inconsistent with the original design <br /> intent. <br /> 3.12 Makinq investigations involving detailed appraisals and <br /> valuation of existing facilities, and surveys or inventories <br /> required in connection with construction performed by the Owner. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.