. • <br /> , �2.15 The A/E shall review and approve shop drawings, samples, <br /> and other submissions of the Contractor for conformance with the N/A <br /> design concept of the Project and for compliance with the <br /> information given in the Contract Documents. <br /> 2.16 The A/E shall prepare Change Orders as required. N/A <br /> 2.17 The A/E shall report to the Owner those observed conditions <br /> at the job site and/or in the Work which doesn't conform to the <br /> Contract and which the Contractor fails to correct. <br /> 2.18 The A/E shall conduct inspections to determine the date of <br /> substantial completion and final completion, and shall verify N/A <br /> that discrepancies found are corrected. The A/E shall also <br /> receive and review written guarantees and related documents <br /> assembled by the Contractor, and shall issue a final Certificate <br /> for Payment. � <br /> 2.19 In order to insure that the project can be completed within <br /> the final approved cost estimate, multiple-material based bids <br /> may be used. Deductible alternates shall also be included to the <br /> extent, that in the opinion of the Owner and of EDA, they do not <br /> alter the scope of the project in an amount to significantly <br /> affect its economic impact, project justification or project <br /> revenue. The Invitation for Bid will specify that should the <br /> bids exceed the estimate, deductive alternates will be accepted <br /> in the order in which they are listed, to the extent necessary to <br /> stay within the funds available, with a reasonable reserve for <br /> construction contingencies. <br /> 2.20 Payment for Basic Services shall be as set forth in <br /> Section 6. <br /> SECTION 3 <br /> If authorized in writing by the Owner, the A/E shall furnish or <br /> obtain from others the following services, which are not <br /> considered normal or customary basic services. These services <br /> will be paid for as mutually agreed in Section 6 of this <br /> Agreement. <br /> 3.1 Provide field surveys for design purposes and engineering <br /> surveys and construction staking to enable the Contractor(s) to <br /> proceed and complete their work in a timely fashion as required <br /> in the Contract Documents, and to make such survey measurements <br /> as may be necessary after construction to prepare the as built <br /> set of drawings. Any extra surveying and staking beyond that <br /> normally required to accomplish the project in a timely manner <br /> will not be paid for by the Owner unless approved in writing, <br /> prior to performance of the services. <br /> 4 <br />