My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R93-13 AUTHORIZING ARCHITECHURAL / ENGINEERING AGREEMENT AND AGREEMENT AND MORTGAGE
COD
>
City Clerk
>
RESOLUTIONS
>
1993
>
R93-13 AUTHORIZING ARCHITECHURAL / ENGINEERING AGREEMENT AND AGREEMENT AND MORTGAGE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 3:18:32 PM
Creation date
7/19/2016 3:18:29 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R93-13
Res Ord Title
AUTHORIZING ARCHITECTURAL / ENGINEERING AGREEMENT AND AGREEMENT AND MORTGAGE - ECONOMIC DEVELOPMENT ADMINISTRATION
Approved Date
2/1/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• •, <br /> 2.7 At the end of construction phase and prior to the final <br /> payment for the architectural/engineering services, the A/E shall <br /> furnish one set of "as built" drawinqs to the Owner. The N/A <br /> construction phase commences with the award of the construction <br /> contract and terminates when the final Certificate for Payment to <br /> the Contractor is approved by the A/E and accepted by the Owner. <br /> 2.8 The A/E shall provide administration of the construction N/A <br /> contract(s) , as provided herein, and the General Conditions of <br /> the Contract. <br /> 2.9 The A/E, as the representative of the Owner during the <br /> Construction Phase, shall advise and consult with the Owner and N�A � <br /> all of the Owner's instructions to the Contractor shall be issued <br /> through the A/E. The A/E shall have authority to act on behalf <br /> of the Owner to the extent provided in the General Conditions, <br /> unless otherwise modified in writing. � <br /> 2.10 The A/E shall, at all times, have access to the Work, <br /> wherever it is in preparation or in progress. <br /> 2.11 The A/E shall make periodic visits to the site to <br /> familiarize himself generally with the progress and quality of <br /> the Work and to determine in general if the Work is proceeding in <br /> accordance with the Contract Documents. On the basis of his on- <br /> site observations, he shall endeavor to guard the Owner against <br /> defects and deficiencies in the Work of the Contractor. The A/E <br /> shall not be responsible for construction means, methods, <br /> techniques, sequences or procedures, or for safety precautions <br /> and programs in connection with the Work. <br /> 2.12 Based on such observations at the site and on the <br /> contractor's request for progressive payment, the A/E shall <br /> determine the amount owing to the Contractor, and shall so <br /> certify on the payment request. <br /> 2.13 The A/E shall be the interpreter of the requirements of the <br /> Contract Documents and the impartial judge of the performance <br /> thereunder by the Contractor. The A/E shall make determinations <br /> for the Owner on all claims of the Contractor relating to the <br /> execution and proqress of the Work and on all other matters or <br /> questions related thereto. <br /> 2.14 The A/E shall have authority to reject Work which does not <br /> conform to the Contract Documents. Whenever, in the A/E�s <br /> reasonable opinion, the A/E considers it necessary or advisable <br /> to insure the proper implementation of the intent of the Contract <br /> Documents, the A/E will have authority to require special <br /> inspection or testing of any Work in accordance with the <br /> provisions of the Contract Documents whether or not such Work be <br /> then fabricated, installed or completed. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.