Laserfiche WebLink
' �� <br /> ,� � 88CTION 2 <br /> That the A/E shall furnish Basic A/E Services as follows: <br /> 2.1 The A/E shall prepare schematic design studies including <br /> necessary drawings required to determine project feasibility, <br /> illustrating the scale and relationship of major project N/A <br /> components for approval of the Owner. This submission will <br /> include an estimated project cost based upon current area, <br /> volume, or other unit cost. <br /> 2.2 The A/E shall prepare from the approved schematic design <br /> studies, for approval by the Owner, the preliminary design <br /> documents consisting of drawings and other documents to fix and <br /> describe the size and character of the entire Project as to <br /> structural, mechanical and electrical system, materials and such <br /> other essentials as may be appropriate. <br /> 2.3 The A/E shall prepare from the approved preliminary desiqn <br /> documents, for approval by the Owner, final working drawinqs and <br /> specifications setting forth in detail the requirements for the <br /> construction of the entire Project, including the necessary <br /> advertisement for bids; information for bidders; bid forms; <br /> payment and performance bond format; contract format; general and <br /> supplementary general conditions, and an index to the foregoing. <br /> The A/E shall supply, without additional cost, a sufficient <br /> number of complete sets of detailed plans, specifications and <br /> contract documents for review by the Owner and/or appropriate <br /> Federal, State, and local agencies having approval authority, <br /> plus a sufficient nwnber of complete sets for the purpose of <br /> executing contracts, with at least three copies for each prime <br /> contractor to whom award is made. The total number of sets for <br /> the above purposes shall not exceed sets. The A/E shall also <br /> supply sufficient bidding documents to meet the needs of <br /> prospective bidders, suppliers, subcontractors and other <br /> interested parties, and may charge for them the reasonable cost <br /> of preparing such copies. <br /> 2.4 The A/E shall submit to the Owner a final project <br /> construction cost estimate in sufficient detail that it may be <br /> used to evaluate bids received from construction contractors. <br /> 2.5 The A/� shall assist the Owner in filing the required <br /> documents for the approval of governmental authorities having <br /> jurisdiction over the Project. <br /> 2.6 The A/E, following the Owner's approval of the Contract <br /> Documents and of the latest estimated project construction cost, N/A <br /> shall assist the Owner in obtaining bids, attend the bid opening, <br /> tabulate bids, review proof of bidder's qualifications, recommend <br /> approval or disapproval, and assist in the preparation and award <br /> of construction contracts. <br /> 2 <br />