Laserfiche WebLink
BBCTION 5 <br /> 5.1 If requested by the Owner or recommended by the A/E and <br /> agreed to in writing by the Owner, the A/E will furnish a <br /> resident construction inspector. Payment for resident inspection <br /> services will be as set forth in Section 6. <br /> 5.2 Through more extensive on-site observations of the work in <br /> progress and field checks of materials and equipment by the <br /> resident construction inspector, the A/E shall endeavor to <br /> provide further protection for the Owner against deficiencies in <br /> the work. <br /> 5.3 The A/E assur�s the Owner that the resident construction <br /> inspector shall be skilled in the professional calling necessary <br /> to perform the duties of the position. The duties of the <br /> resident construction inspector shall include, but not <br /> necessarily be limited to, the following: <br /> (1) Physically oversee the various parts of the work of the <br /> construction in all phases to determine that the work performed <br /> is in accordance with the plans and specifications. <br /> (2) Coordinate the work of the various prime contractors <br /> when separate contracts exist for work such as mechanical, <br /> electrical, structural improvements, site paving improvements and <br /> the like. <br /> (3) Prepare daily written reports on contractors on the <br /> job, their manpower, work performance, weather, instructions to <br /> contractors, unusual events, visitors and the like. <br /> (4) Prepare "punch lists" of items to be corrected, added, <br /> or deleted to make the work conform to the plans and <br /> specif ications. <br /> (5) Assist the Owner in making final inspections. <br /> (6) Hold job conferences from time to time as may be <br /> necessary for scheduling of the various portions of the project. <br /> (7) Advise the A/E as regards certifying the Contractor's <br /> request for progressive payment. <br /> (8) Report to the A/E and the Owner any problems which are <br /> delaying, or are anticipated to delay, the Work. <br /> (9) Secure weekly payroll records from all contractors and <br /> subcontractors and submit to the Owner. <br /> 7 <br />