Laserfiche WebLink
I�� � � - EXHIBIT "A" <br />� • • January 12, 1993 <br /> i • ' Page 2 of 9 <br /> PROJECT REQUIREMENTS <br /> (Continued) <br /> B. DISTRIBUTION OF SERVICES AMONG PROJECT PARTICIPANTS: <br /> 1 . ENGINEERING SERVICES BY BLANK, WESSELINK, COOK & ASSOCIATES, INC. <br /> BWC : <br /> a. Civil , Traffic, Environmental , and possibly Structural <br /> Engineering. <br /> b. Technician/Drafting. <br /> c. Administrative. <br /> 2. SERVICES BY CITY OF DECATUR: <br /> a. Designate representative for contact. <br /> b. Provide for access to study site. <br /> c. Provide all available aerials, drawings, existing traffic data, <br /> and Brush College Road Project design plans and specifications <br /> and design traffic data. <br /> d. Execute letter of introduction to involved industrial , <br /> commercial , and institutional facility representatives advising <br /> each organization of the duties of BWC and requesting <br /> cooperation. <br /> 3. SERVICES BY OTHERS: <br /> None <br /> 4. SERVICES NOT INCLUDED: <br /> a. Detailed Location/Design Corridor Study Report. <br /> b. Physical Traffic Counts required in addition to Traffic Count <br /> Data received f rom the City of Decatur. <br /> c. Attendance or representation on behalf of City of Decatur at <br /> any meetings or hearings with any government regulatory agency <br /> or group. <br />