Laserfiche WebLink
t � <br /> CITY OF DECATUR, ILLINOIS <br /> CITY PROJECT NO. 9148 <br /> ENGINEERING SERVICE AGREEMENT <br /> THIS AGREEMENT, made and entered into the � day of � .D., 19,�r <br /> by and between the CITY OF DECATUR, ILLINOIS, hereinafter referred t a the "CI "and WVP <br /> CORPORATION, hereinafter referred to as the "ENGINEER",covers profe i nal <br /> engineering/architectureservices in connection with the preparation of plans, specifications,estimates <br /> of cost and construction of the proposed renovation of the Decatur Industry and Technology Center, <br /> EDA Grant Project Number 06-01-2555. <br /> WITNESSETH THAT, in consideration of these premises and of the mutual covenants herein <br /> set forth, , <br /> THE ENGINEER AGREES, <br /> 1. Basic Services- To perform or be responsible for the performance of the following <br /> professional engineeringservices for the CITY in connection with the proposed improvements <br /> hereinafter described: <br /> a. Hold start-up meeting including representativesfrom CITY, ENGINEER, and sub- <br /> consultant. <br /> b. Perform on-site surveys as are necessary for the preparation of detailed plans. <br /> c. Prepare 35 percent complete sets of plans, specifications and estimates and submit <br /> three (3) sets to CITY for review. These will serve as a basis for the final <br /> construction documents. <br /> d. Items to be included in the construction documents are as defined in the CITY's <br /> Request for Proposal dated October 24, 1991 and detined as Exhibit "A"which is <br /> attached and made a part of this AGREEMENT. <br /> e. Assist the CITY in connection with the CITY's responsibilityfor filing documents <br /> required for the approval ofi governmental authorities having jurisdiction over the <br /> Project. <br /> f. Prepare 95 percent complete set of plans, specifications and estimates and submit <br /> three (3) sets to CITY for review. <br /> g. Make required revisions in plans, specifications and estimates based on 95 percent <br /> review and submit final contract documents to the CITY. <br /> h. Two review meetings,at the 35 percent and 95 percent stages, plus two additional <br /> meetings are included in the lump sum fee. <br /> 1 <br />