My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R91-126 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1991
>
R91-126 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2016 2:55:51 PM
Creation date
7/25/2016 2:55:51 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R91-126
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FLOOD GATE STOP LOGS INSTALLATION CITY PROJECT 9137
Approved Date
8/5/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J7�'29�'�1 12:�3 P R V W BU I LD I h!G — 3RU FLOOP. �G�2 <br /> II <br /> � II <br /> D <br /> BLA�K & VEAT�H <br /> . �_. , � � <br /> ii�41�1)Wnnj P�rL,v.csy,PC).Box Np.8405,Kansos G�,Atissouri b4114,(913):339-2(J00 <br /> Decatur� Illinois B�V Proj�ct 116ti0.170 <br /> Lake Decatur Dam Improvements B&Y Fit� 8-1.1 <br /> July 29, I991 <br /> Ms. Chandra Russell , p.E. <br /> City Engineer <br /> Depart�nt of Public Works <br /> Na. 1 Civi� Center Plaza <br /> De�atur, Illinois 62523 <br /> Subject: Stop Log Delivery and <br /> Installation <br /> Dear: Ms. Russell <br /> This ietter will document our discussivns late last we�k coneerning the <br /> delivery and installativn of aluminum 5tap logs manufactured by Rodney <br /> Nunt Co�pany. <br /> In making delivery arrangements� it was discvvered that Radney Hunt h�d <br /> manufactured only one of two required sets of stop togs. (Note that <br /> there are 15 stop logs per set. ) This is Rodney Hunt's mistake and th�y <br /> have agreed to manufacture the secQnd �et af stop logs by August 23, <br /> I991. Th�y will hold the first set of logs and ship both sets on ar <br /> before August �3. Allowing one week for delivery, the stop logs shauld <br /> be delivered to the Sauth Water Treatment plant by August 30. <br /> It is Bldck $ VedtCh'S understanding that the City has 45 days from the <br /> date af the bid opening to award the rantract for installing ths stap <br /> logs. September 5 w�ll be the last day of the 45 day period, There <br /> should be sufficient time to award the contract after cvnfirmation from <br /> Rodney Hunt that the sto}� ]ogs have been shipped- <br /> On Friday, Ju1y 26, Terry Leeds of 81ack & Veatch� and George Hill of <br /> Mid States In�. , (the only bidder on the stop log installation contract) <br /> discussed the status of the stop logs and the pra�ect in gene�al. <br /> Georg� indicated that thts delay should not cause him any problems as he <br /> 15 a local contractor. Ne did however express a cancern about the <br /> diving operation (required by the contra�t) during periods qf high flows <br /> over t�he dam. Ne stated that currently th�re is no flow going flver the <br /> dam. <br />
The URL can be used to link to this page
Your browser does not support the video tag.