Laserfiche WebLink
� ' � 07i29i91 12:�� B & V bl BU I LL�I FJG — 3RD FLD�JR ��J3 <br /> Page 2 <br /> Ms. Chandra Russetl , P.E. BB�V project 11600.17Q <br /> Ms. Russell July 29, 1991 <br /> In disCussing the project, nQthing was said that would cast any doubt in <br /> Mid States Inc. 's ability to do the work. Mid States bid of $15,000 is <br /> prob�bly the bare minimum to do the work �s long as everything goes as <br /> planned. �lack & Veatch reco►miends that the contra�t be awarded tc� Mid <br /> States upon the confirmation of a stop iog detivery date. <br /> This d�l�y in getttng the stop ivgs installed will delay most of the <br /> ather improvernents at the dam until next spring. pne item of work that <br /> �an probably b� accomplished this fall is the inspection of the existing <br /> flood ga�tes and if consider�d appropriate� the gates cauld be repaired <br /> and returned to service. <br /> Please contact me at 913-339»38Z5 with any questions or c�r�rnents. <br /> Very tru]y yours, <br /> BLACK & VEATCN <br /> � � <br /> �� �� � <br /> $amuel L. Wol bdrger, .E. <br /> Project Manager <br /> tcl <br /> cc: Mr. Jim Mayhugh <br /> Mr, John Smith <br />