My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-94 ACCEPTING BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH BURDICK PLUMBING & HEATING COMPANY, INC. (CITY PROJECT 2016-10)
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-94 ACCEPTING BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH BURDICK PLUMBING & HEATING COMPANY, INC. (CITY PROJECT 2016-10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2016 2:58:09 PM
Creation date
8/2/2016 2:57:05 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-94
Res Ord Title
ACCEPTING BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH BURDICK PLUMBING & HEATING COMPANY, INC. TO PERFORM 2016 ANNUAL WATER MAIN REPLACEMENT PROJECT, LAKE RIDGE ADDITION - CITY PROJECT 2016-10
Approved Date
7/18/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cement mortar lining that prevents this from happening. This project will eliminate sections of water <br /> main that are prone to leaking and have water quality issues. <br /> Bidding <br /> The project plans and specifications included two alternate bids to obtain comparative material pricing: <br /> 1. Ductile iron water main (which is normally specitied by the City) <br /> 2. PVC plastic water main (which is infrequently used by the City, only in special situations) <br /> The project was advertised on May 26, 2016, and bids were opened on June 22, 2016. The bid <br /> tabulation is attached. The results of the letting are: <br /> __ ___ __ __ _ __ <br /> ' Compared to ' <br /> Engineer's Est. <br /> _ _ Bidder ; Bid Price Over -Under ; <br /> _ __. _ : . __ <br /> Burdick Plumbing& Heating Co., Inc.—Ductile Iron Pipe $1,362,984.00 12.6% <br /> _.._.. _ , <br /> Burdick Plumbing & Heating Co., Inc.—PVC Plastic Pipe , $1,358,524.00 16.1% ; <br /> _. __ : <br /> , Engineer's Estimate for Ductile Iron Pipe , $1,210,070.00 , ------- ', <br /> _. _ ; . . __ _ <br /> ' Engineer's Estimate for PVC Plastic Pipe ' $1,170,170.00 ------- I <br /> _ __ __ <br /> Recommended Award <br /> The ductile iron pipe bid was insignificantly more expensive ($4,460 or 0.33% of the total project cost) <br /> than PCV plastic pipe. However, City staff strongly recommends that the ductile iron pipe bid be <br /> awarded for these reasons: <br /> • Ductile iron has a slightly larger inside diameter that allows for greater water flow than PVC. <br /> • Ductile iron is a much stronger material than PVC. <br /> • Ductile iron is much easier to locate with above ground locating equipment than PVC. <br /> • It is easier to locate leaks in ductile iron as it transmits sound waves better than PVC. <br /> • City staff are more familiar and competent with ductile iron repairs than PVC repairs. <br /> Burdick Plumbing & Heating Company, Inc. provided the only bid for the proposed work. The firm <br /> has satisfactorily completed numerous projects for the City. Staff recommends that the City Council <br /> approve a contract with Burdick Plumbing & Heating Company, Inc., to perform the 2016 Annual <br /> Water Main Replacement Project, Lake Ridge Addition, with ductile iron pipe. <br /> SCHEDULE: <br /> The project is scheduled to begin in August and be completed in November. <br /> BUDGET/TIME IMPLICATIONS: <br /> Funding for this project is allocated in the Water Capital Fund. <br /> POTENTIAL OBJECTION: <br /> There are no known objections to this resolution and bid award. <br /> INPUT FROM OTHER SOURCES: <br /> Department of Public Works. <br /> Page � 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.