My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R90-15 AUTHORIZING INTERGOVERNMENTAL COOPERATION AGREEMENT - SANITARY DISTRICT OF DECATUR
COD
>
City Clerk
>
RESOLUTIONS
>
1990
>
R90-15 AUTHORIZING INTERGOVERNMENTAL COOPERATION AGREEMENT - SANITARY DISTRICT OF DECATUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2016 9:26:57 AM
Creation date
8/5/2016 9:26:49 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R90-15
Res Ord Title
AUTHORIZING INTERGOVERNMENTAL COOPERATION AGREEMENT REHABILITATION OF BROADWAY SEWER (SOUTH COMBINED SEWER OUTFALL), CANTRELL STREET SEWER (COMBINED SEWER OUTFALL) AND CANTRELL STREET TRUNK SEWER - SANITARY DISTRICT OF DECATUR
Approved Date
2/5/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�v � <br /> f <br /> sections are considered structurally adequate, major deficiencies <br /> being leaking joints and hairline cracks throughout. Some minimal <br /> joint and crack repair should be provided. The remainder of this <br /> section of sewer warrants extensive rehabilitation including struc- <br /> tural linings, provision of shaped inverts to confine low flows, <br /> repair of substantial voids and similar work. Areas of most crit- <br /> ical needed repairs include (aj the transition section immediately <br /> downstream from the box sewer; (b) the brick arch beneath Jackson <br /> st. ; and (c) the existing gunite repair section under Main St. <br /> extended. <br /> We note the 1966 recommendation that a new 54-inch outfall <br /> sewer be constructed from Jackson St. to the ICG Railroad. This <br /> appears to be an attractive alternate to rehabilitation of the <br /> existing facilities. There is, however, a substantial cost dif- <br /> ferential between provision of a new facility versus rehabilitation <br /> of the existing outfall. It must be noted that building constr.uc- <br /> tion has extended over the existing sewer alignment. Any replace- <br /> ment of this sewer would most likely be directed along Cantrell <br /> Street, continuing westerly beyond Franklin Street to a point of <br /> discharge. We also believe that if a new sewer is constructed it <br /> should not terminate at the ICG Railroad as suggested in the 1966 <br /> Report, but should continue beneath the Railroad to its present <br /> point of termination. With this in mind we have prepared alternate <br /> estimate of cost for consideration, together with the following <br /> summation of relative merits of the two system as follows: <br /> 87023A 8-15 <br /> 24 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.