My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R89-113 AUTHORIZING AGREEMENT - WVP CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
1989
>
R89-113 AUTHORIZING AGREEMENT - WVP CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 2:45:43 PM
Creation date
8/8/2016 2:45:42 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R89-113
Res Ord Title
AUTHORIZING AGREEMENT - WVP CORPORATION
Approved Date
8/21/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � �I�I p C�00 l�p0o 1��1�II0o �1 <br /> I��gnr�c�c�r�� �r�c�I�n�c�c��� I�Il����r�� <br /> 3040 N.University Ave. Box 2320 Decatur,IL 62526 217-875-4800 <br /> PROFESSIONAL SERVICE CONTRACT <br /> �h <br /> PARTIES TO THIS AGREEMENT, made as of the��ay of , 19�, by and <br /> CONTRACT befinreen City of Decatur, Illinois, herein after referre to he "O NER" and WVP <br /> Corporation, hereinafter referred to as the "ENGINEER'. <br /> AUTHORIZATION The OWNER by resolution duly passed and adopted by its proper officers on the <br /> day of ,A.D., 19 , authorized and directed the <br /> employment of the ENGINEER to represent the OWNER in all matters as defined in <br /> the Scope of Services and Additional Services of ENGINEER described herein. <br /> DESCRIPTION Paraaraph 1 -Description of Project. <br /> OFPROJECT , <br /> A. Without intent to expand, limit or define the scope of services of ENGINEER, <br /> the OWNER intends to: <br /> Study and design needed improvements to Incubator/Tech Center. <br /> SERVICES OF Paraaraph 2-Services of ENGINEER. <br /> ENGINEER <br /> The ENGINEER shall perform services as follows: <br /> A. Phase I-Evaluation: <br /> 1. Site survey to supplement existing plans and establish existing site <br /> conditions and building floor plans. <br /> 2. Visual structural deficiency review,one instance only in _ <br /> Engineering Building <br /> 3. Electrical system review <br /> 4. HVAC system review <br /> 5. Energy consetvation review <br /> 6. Sprinkler systems review <br /> 7. Space utilization plan <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.