Laserfiche WebLink
data comprising the Contractor's Appl(cation for Payment,that chey shail be pald for by the Owner as provided in this Agree- . <br /> the vVork has progresscd to the point indicated and that,to thc ment. Such Additional Servlces shall include, in addition to � <br /> best of the Architect's knowledge, information and belief, those described In Parographs 3.2 and 3.3, budget analysis, <br /> qualtty of the Work is in accordancc with the Contract Docu- Mancial feasibUity studles; pianning surveys, environmental � <br /> ments. Tht lssuance of a Certlficate for Payment shali not be a studies, mcasured drawings of ealsting conditlons, coordina- <br /> rcpresentation that the Architect has (1) made exhaustive or tion of separate rnntractors or indeprndent consultants,coor- <br /> continuous on-slte inspections to check the quallty or quantity dinatlon of constructlon or pro�ect man�gers, detailed Con- <br /> of the Work,(2)rcvlewed construcNon mcans,methods, tech- stniction Cost estimata,quanNty surveys,Interior design,pian- <br /> nlques,sequences or procedures,(3)revkwed copies of requi- ning of tenant or rcnt�i spaces, Inve�todes o[ m�terials or <br /> sitlons rcceived from Subcontractors and material supplicrs and equlpment,preparation of record drawinga,and any other ser- <br /> other dat�requested by the Owner to substantiate the Contrac- . vices not otherwise included tn this Agrecment under Basic Ser- <br /> tor's right to paymrnt or(4)ascertained how or for what pur- vices or not customarily fumished in accordance with generally <br /> pose the Contractor has uxd money previously paid on accepted uchitectur�l practke. <br /> account of the Contract Sum. <br /> 3.Z If more extensive reprcsentatioh at the site than la <br /> 2.4.10 The Architect shall have authority to reJect work which described in Subparagraph 2.4.5 is required, such additicmal <br /> does not conform to the Contract Documents and will have pro�ect represrntatl�n shall be provided and paid for as xt <br />' authorlty to requlre addiNonal inspecdon or testing of the fonh In Anlcles 11 and 12. <br /> Work whrnever, in the Architect's reasonable opinion, it is �.3 As an Addidonal Service in connecdon with Change <br /> necessary or advlsable for the implementation of the Intent of prders�nd Construction Ch�nge Direcdves,the Architect shail <br /> the Contract Documents. • <br /> prepue Dr�wtngs,Spedflcations and othcr documentation and <br /> Z.�.11 The Archltect shall review and approve or take other data, evaluate Contractor's proposals, and provide any other <br /> appropri�te�ctlon upon Contr�ctor'a submittals such as Shop services made neces,gary by such Ch�nge Orders and Construc- <br /> Drawings, Producc Dat�and Samples, but only for the Ilmited tlon Change Oirectives. <br /> purpose of checking for conformance with Information givrn � <br /> and the design concept expressed in the Contract Documents. <br /> The Architect's actioo shall be taktn with such re�sonabk <br /> promptness as to puse no delay.The Architect's approvai of a <br /> speciflc ltem shall not indlcate approval of an assembiy of <br /> whkh the item is a component.When professional certiflcation <br /> of performance charactedstics of materials, systems or equi� ARTICLE 4 <br /> ment l� required by the Contract Documents, the Architect <br /> shal!be rntltled to reiy upon such cenittcation to estabiish that OWNER'3 RESPONSIBILITIES <br /> the matedals,systems or cquipment will meet the performance � <br /> criteria requircd by the Contract Documents. 4.1 The Owner shaii provide fvll information, including a pro- <br /> gram which shall set forth the Owner's obJectives, schedulc, <br /> 2.4.1Z The Archltect shall prepare Change Orders and Con- constraints,budget with reasonable contlngrncies,and crite�ia. <br /> struction Change Directives, with supporting documentation . <br /> and data if authodzed or conflrmed irt writing by the Owner as 4.2 The Owner sh�li furnish surveys describing physical char- <br /> provided in Paragraphs 3.1 and 3.3, for the Owner's approval acteristics, legal Iimitations and uNlity locatlons for the site nf <br /> and cxecutlon in accordance with the Contract Documcnts, the Pro�ect, a writttn Icgal descdption of the site and the ser- <br /> and may�uthorize minor changes In the Work not i�volving an vices of geotechnical engineers or other consuitants when such <br /> adeustment In the Contract Sum or an eatension of the Contract servkes arc rcquested by the Mchitect. <br /> Time which are not inconsistent with the intent of the Contract • <br /> Documents. d.3 The Owner shall fumish structural, mechanicai,chemic:il, <br /> air and water polluNon tests, tests for ha�ardous materials,and <br /> 2.4.13 T'he Architect shall cvnduct Inspections to determine �cher laboratory �nd environmentai tests, inspections and <br /> the dates of Substantial Compiedon and Mai completion and reports required by taw or the Contract Documents. � <br /> shai! issue a final Cvtlflcate for Payment. 4.4 The Owner shall furnish all iegal,accounting and insurance <br /> 2.4.1� The Architect shali interpret and declde matters con- counsefing servkes as may be nece.ssary at any time for the I <br /> ceming performance of the Owner and Contractvr under the Proiect, induding anditing services the Owner may require to <br /> requirements of the Contract Dacuments on evritten requcst of verify the Contractnr's Applicadons for Payment or to a.5certain , <br /> either the Owner or Contractor. The Architect's respon,u to how or for what purposes the Contr�ctor has used the money <br /> suc:� requests shall be made with rez5onable promptncs.4 and pald by the Owner. <br /> wlthin any tlme ilmits agreed upon. When making such i�ter- 4.g The foregoing services, information, surveys and rene�rts <br /> pretatlons and inittal decisions, the Architect shall endcavor to <br /> securc faithfui performance by both Owner and Contractor, shall be furnished at the Owner's expense, and the Architect <br /> shail not show partiality to elther, and shall not be Ilable for shall be entitted to rely upon the accuracy and compicteness <br /> results of interpretattons or dccisions so rendcrcd in goc�d faith. thereof. <br /> � 4.8 Prompt written notice shall be given by thc Owner to the <br /> Architect if the Owner becomes aware of any fault or defect in <br /> ARTICLE 3 the ProKet or nonconformance with the Contract Documents. <br /> AQDITIONAL SERVICES 4.7 The proposed language of cenificates or certifications <br /> requested of the Architect or Architect's consultants shall he J <br /> 3.1+ Addidon�i Servkes shall be provided if authorizeci or con- suhmitted to the Architect for review and a�roval at least 14 <br /> litmed in wddng by the Owner or if included in ArNcie l 2,and days prior ro ezecution. <br /> AIA DOCUME!!T 8151�AROREVIATED OWNER-ARCf11TECTAGREEMENT�T'fItRU F.171TION�AfA'� • �019A7 <br /> .� ��51`�9a7 TIIF,AMF.RiCAN INSTtTIlTE OF ARf.}IITECT3, 1735 NPW YQRK AVENUE,N.W.,WASNINrTON.D.C. 211(x16 <br />