Laserfiche WebLink
� - _ �A <br /> AGREE�tENT FOR Pr2ELI��IIP�ARY AND <br /> COPJSTRUCTIOPJ ENGIP�EERING SERVICES <br /> THIS AGRFEt+�ENT, made and entered in this day of , <br /> 1989 ,bY ancl bet►•ieen Phi 11 i p MJ. Cochran, Consul ting Enc�i neer, 270 U. Prai rie <br /> Suite 4, Decatur, Illinois 62523, hereinafter called the ENGINEER and the CITY <br /> I)F DECATUR, State of Illinois, hereinafter called the CITY covering certain <br /> professional engineerin� services in connection �•�ith the preparation of plans, <br /> specifications, estimates and construction �uidance for proposed city street <br /> improvements. The said city street improvements are to be the reconstruction <br /> of curbs and gutters and sidewalks along various specified city streets and <br /> is desic�nated as "CITY PROJECT N0. 8903 , Neic�hborhood Strategy Area Improve- <br /> ments". <br /> t•JITNESSETIi THAT, in consideration of these premises and of the mutual <br /> covenants herein set forth, <br /> A. TIIE ENGINEER AGREES, <br /> 1 . To perform the follo��inn professional services for the City, under <br /> the direct supervision of the Director of Public ��Jorks, in connec- <br /> tion �•�ith �he proposed iriprovement hereinbefore described: <br /> a. �1ake such detailed surveys as are necessary for the preparation <br /> of�detailed plans. <br /> b. Fiake cor�plete gener•al and detailed plans, special provisions and <br /> estin�ates of cost and furnish the City ��ith the tracings of the <br /> plans. <br /> c. Fur•nish construction c�uidance. Construction guidance shall in- <br /> clude: <br /> 1 . Consultation on interpretation of plans and specifications <br /> and chanc�es under consideration as construction proceeds. <br /> 2. Periodical job-site inspection by the Enc�ineer, or his '� <br /> representatives, as construction progresses. <br /> 3. Revie►•�ing and checking all payment estimates, change orders, ' <br /> records, and reports required by the Public Agency. <br /> 4. Safeguarding the Public Agency against defects and deficien- ' <br /> cies on the part of the contractor, but the Engineer does not � <br /> guarantee the performance of the contract by the contractor. <br /> 5. Conducting final inspection of construction and preparation <br /> of final papers and reports. � i <br /> 6. Inspection of contractor's operations to insure compliance <br /> ��ith the plans and specifications and the keeping of complete <br /> project records. <br /> � <br />