My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-53 GRANTING SPECIAL PERMIT PLANNED UNIT DEVELOPMENT
COD
>
City Clerk
>
ORDINANCES
>
1994
>
94-53 GRANTING SPECIAL PERMIT PLANNED UNIT DEVELOPMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2016 11:57:04 AM
Creation date
8/12/2016 11:57:04 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
94-53
Res Ord Title
GRANTING SPECIAL PERMIT PLANNED UNIT DEVELOPMENT - SOUTHEAST QUADRANT OF ROUTE 51 NORTH AND INTERSTATE ROUTE 72
Approved Date
7/18/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. • HICKORY.WK4 06/28/94 <br /> HICKORY POINT APARTMENTS (SOUTHI <br /> OFFSITE IMPROVEMENT SUMMARY <br /> . DESCRIPTION QEVELOPER CITY TOTAL NOTES <br /> 12"WATERMAIN $28,900.00 $6,800.00 $35,700.00 1 <br /> FORCE MAIN $16,500.00 $5,430.00 $21,930.00 2 <br /> TEMPORARY ROAD ACCESS $20,000.00 $22,000.00 $42,000.00 3 <br /> ENGINEERING DESIGN $3,238.00 $762.00 $4,000.00 4 <br /> TOTAL $68,638.00 $34,992.00 $103,630.00 <br /> NOTES <br /> ( 1 ) 12"W.M.EXTENSION FROM SHUTTER DR. NORTH ALONG EAST SIDE <br /> OF M.L.KING FOR 1700 L.F. DEVELOPER'S SHARE BASED ON COST <br /> OF 8"W.M. EXTENSION. <br /> (2)6"FORCE MAIN FROM LfFT STATION TO GRAVITY SEWER SOUTH OF <br /> SHUTTER DR.( 1500'), DEVELOPER'S SHARE BASED ON THE COST <br /> OF A 4"FORCE MAIN. CITY'S SHARE BASED ON THE COST TO UPSIZE. <br /> (3)TOTAL REFLECTS THE ESTIMATED COST TO CONSTRUCT AN 18' <br /> WIDE AGGREGATE ACCESS ROAD ALONG THE M.L.K. R.O.W.ALLOWING <br /> THE CONSTRUCTION OF THE DEVELOPMENT TO PROCEED CONCURRENT <br /> WITH CONSTRUCTION OF M.L.K. EXTENSION. THE DEVELOPER'S SHARE IS <br /> BASED ON THEIR INITIAL OFFER TO PROVIDE ALTERNATE CONSTRUCTION <br /> ACCESS OTHER THAN THE USE OF CRESENT AVE. <br /> . (4)$4,000 ENGINEERING COST PRORATED ACCORDING TO PARTICIPATION <br /> IN 12"WATERMAIN. <br /> EXHIBIT "B" <br />
The URL can be used to link to this page
Your browser does not support the video tag.