My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-106 APPROVING A CHANGE ORDER TO THE ENGINEERING SERVICES AGREEMENT WITH CARL WALKER, INC. FOR DESIGN SERVICES FOR PARKING GARAGES B AND C CITY PROJECT 2015-03
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-106 APPROVING A CHANGE ORDER TO THE ENGINEERING SERVICES AGREEMENT WITH CARL WALKER, INC. FOR DESIGN SERVICES FOR PARKING GARAGES B AND C CITY PROJECT 2015-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2016 10:13:25 AM
Creation date
9/26/2016 10:13:21 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-106
Res Ord Title
APPROVING A CHANGE ORDER TO THE ENGINEERING SERVICES AGREEMENT WITH CARL WALKER, INC. FOR DESIGN SERVICES FOR PARKING GARAGES B AND C CITY PROJECT 2015-03
Approved Date
9/19/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS MEMORANDUM � <br /> NO. 2016-57 <br /> DATE: September 2, 2016 <br /> TO: Honorable Mayor Moore Wolfe and City Council Members <br /> FROM: Tim Gleason, City Manager <br /> Richard G. Marley, P.E., Public Works Director <br /> SUBJECT: Change Order#1 to the Agreement with Carl Walker, Inc. to Design the <br /> Improvements to Parking Garages B and C <br /> City Project 2015-03 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the Resolution authorizing Change Order <br /> #1 to the Engineering Services Agreement between the City of Decatur and Carl Walker, Inc. to <br /> provide design services for the improvements to Parking Garages B & C. Change Order#1 adds <br /> $13,138.75 to the existing $30,000 Agreement for a total fee of$43,138.75. <br /> PRIOR COUNCIL ACTION: <br /> • December 7, 2015—The City Council approved Resolution R2015-132 authorizing a <br /> Professional Engineering Services Agreement between the City of Decatur and Carl Walker, <br /> Inc., to provide design and construction engineering services for the improvement of City <br /> Parking Garage B (North and Water) and Parking Garage C (Franklin and Wood) for a fee not <br /> to exceed $30,000. <br /> • 2009-2011 —The City Council approved 3 resolutions for design and construction of the City's <br /> parking garages. <br /> BACKGROUND: <br /> Parking Garage B was constructed in 1966 on the northwest corner of North Street and Water <br /> Street. The parking garage comprises 4 floors and 681 parking spaces. In 2010 the parking garage <br /> was leased to ADM. The lease agreement requires the City to maintain the structural integrity of <br /> the building. <br /> Parking Garage C was constructed in 1966 on the northeast corner of Franklin Street and Wood <br /> Street. The parking garage is a 2 story structure with 773 parking spaces. <br /> In December 2014, an inspection of Parking Garage C by City staff noted severe deterioration in <br /> several structural steel members. Structural engineers with Chastain and Associates, LLC reviewed <br /> the deterioration and recommended repairs at two locations. Photographs of the damage and repair <br /> are included in Appendix A, see photographs 1 - 3. Chastain also recommended that a thorough <br /> structural review be conducted in the parking garages. <br /> Page � 1 <br />