My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-106 APPROVING A CHANGE ORDER TO THE ENGINEERING SERVICES AGREEMENT WITH CARL WALKER, INC. FOR DESIGN SERVICES FOR PARKING GARAGES B AND C CITY PROJECT 2015-03
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-106 APPROVING A CHANGE ORDER TO THE ENGINEERING SERVICES AGREEMENT WITH CARL WALKER, INC. FOR DESIGN SERVICES FOR PARKING GARAGES B AND C CITY PROJECT 2015-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2016 10:13:25 AM
Creation date
9/26/2016 10:13:21 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-106
Res Ord Title
APPROVING A CHANGE ORDER TO THE ENGINEERING SERVICES AGREEMENT WITH CARL WALKER, INC. FOR DESIGN SERVICES FOR PARKING GARAGES B AND C CITY PROJECT 2015-03
Approved Date
9/19/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ca r1 _ <br /> Walker <br /> Revised August 22, 2016 <br /> Mr. Matt Newell email: MNeweIl��DecaturlL.gov <br /> City Engineer, Public Works Department <br /> One Gary K. Anderson Plaza <br /> Decatur, Illinois 62523 <br /> RE: City of Decatur Parking Structures B 8� C- Repairs 2017 <br /> Decatur, Illinois <br /> Carl Walker, lnc. (Cari Walker) Proposal R1-16-127 <br /> Dear Mr. Newell: <br /> Carl Walker is pleased to present this proposal to reduce the scope of the work in the Parking Garages B <br /> & C Structural Improvements construction documents (City Project 2015-13) to be within allotted funding <br /> limit. This proposal includes the additional scope of the following engineering services: a revision and <br /> update of the Constructions Documents and assisting through a Bidding Process. The original scope for <br /> our Construction Administration Services remains the same, and had not incurred a cost. <br /> PROJECT UNDERSTANDING <br /> The City of Decatur, Illinois maintains two downtown parking garages: <br /> Garage B: (1966) located at the corner of E. North St. and N. Water St., 4 level cast-in-place <br /> concrete slab on concrete-encased steel girders and columns, approximately 180,000 sf of <br /> supported floor area, 681 parking stalls. <br /> Garage C: (1966) located at the corner of E. Main St. and S. Franklin St., 2 level cast-in-place <br /> concrete slab on steel beams and columns, approximately 130,000 sf of supported floor area, 773 <br /> parking stalls. <br /> In August, 2015, Carl Walker performed a condition assessment of the two garages (final report issued <br /> October 18, 2015). We found both structures to be in reasonably good, serviceable condition. Past repair <br /> efforts have preserved and protected the structures reasonably well. However, we observed concrete <br /> distress and waterproofing nearing the end of its anticipated service life that require repair to extend the <br /> life of the garages. Our report projected approximately $1,150,000 of needed repairs over the next five <br /> years to address ongoing deterioration and renewal of waterproofing systems. <br /> A repair package was developed and solicited for bids. Unfortunately, with only two bids submitted the <br /> average total price of the two was approximately $556,000 and the maximum City budget was a little <br /> $300,000. <br /> RESTORATION 8� . i�, ,�� i,,: ., , ', <br /> QRESERVATION Solutions � � �����' i � � � ����� <br />
The URL can be used to link to this page
Your browser does not support the video tag.