Exhibit A <br /> The bridge analysis process requires evaluation of the various aspects and components of the <br /> bridge to determine if they are suitable for reuse or repair. Once the analysis is complete, the <br /> results will be reviewed in whole and the appropriate scope of work will be selected. <br /> The evaluations required for a typical bridge during the analysis process generally include: <br /> 1. Geometric & Hydraulic Capacity <br /> 2. Deck <br /> 3. Superstructure (other than deck) <br /> 4. Substructure <br /> 5. Miscellaneous Checks <br /> 6. Stage Construction Feasibility <br /> 7. Economics <br /> The scope of work and fee estimate does not include a hydraulic capacity analysis, a detailed <br /> structural analysis or the coring of the superstructures. If it is determined that these tasks <br /> need to be perFormed, AECOM will coordinate with the City of Decatur. <br /> Once the evaluations of the various geometric, hydraulic, physical and structural aspects of the <br /> structure are finished, an economic evaluation will be completed. The economic evaluation will <br /> estimate the initial construction cost for the various scope of work alternatives being considered <br /> for the project. The estimates will reflect the findings of the other evaluations completed <br /> regarding need for repair, rehabilitation and reconstruction of any structure elements being <br /> considered for reuse. To be considered for reuse an element must be in good or economically <br /> repairable condition with adequate structural capacity. The element must also have sufficient <br /> remaining service life after the project is complete to last as long as the other major elements of <br /> the structure without requiring an unreasonable amount of maintenance. Aesthetic appearance <br /> may also be considered when warranted. <br /> In some instances an economic analysis regarding reuse of existing structure components <br /> may not be necessary. Examples of these cases are structures whose physical condition is <br /> obviously beyond economical repair, a major roadway geometry change causing the <br /> structure to be relocated or unacceptable hydraulic or structural capacity factors. In these <br /> instances the reason for not completing an economic analysis will be well documented in <br /> the Bridge Condition Report. <br /> Cost estimates will be prepared based on initial construction cost to complete the work using <br /> itemized costs. The itemized cost estimates will generally include all significant pay items <br /> necessary to complete the proposed work to include the following: <br /> • Structure pay items to include structure repairs <br /> • Staging &Traffic Control related to the structure <br /> • Profile revisions necessary for structure related issues such as clearances � <br /> A-5 I <br /> Rev 0—9/16/16 <br />