Laserfiche WebLink
r � • <br /> ; • , <br /> CHAPTER 65 <br /> WATER MAIN CONNECTION CHARGES <br /> 1. Before any water main or lateral water main of the City is <br /> tapped, or any connection is made therewith, a permit shall be obtained <br /> from the Water Department upon application made upon forms furnished by <br /> said Department, accompanied by the payment of such connection charge, <br /> if any, as may be provided herein. <br /> 2. If the water main or lateral water main to be tapped or con- <br /> nected with was, at the time of construction, constructed at the cost <br /> of the then owner of the property to be served by such tap or connection, <br /> whether by special assessment or otherwise, a connection charge shall <br /> not be required. In all other cases a connection charge in accordance <br /> with the provisions of this Chapter shall be paid. <br /> 3. If the main or lateral was constructed by special assessment <br /> against property other than that to be served by such tap or connection, <br /> the connection charge shall be computed upon the same basis and rate as <br /> that used to spread the special assessment by which said main or lateral <br /> was constructed. <br /> 4 . If the main or lateral to be tapped or connected with is a <br /> city main or lateral, whether the same was constructed by the City, or <br /> others , and the cost paid by other than special assessment, the connection <br /> charge shall be computed by applying the hereinafter provided for appli- <br /> cable rate for each front foot of the lot or parcel of land to be served <br /> by such tap or connection, said rate to be determined by the time during <br /> which such main or lateral was constructed as follows : <br /> Before After <br /> 8/31/76 8/31/76 <br /> Base Single Payment For Each Front Foot $ 5. 00 $ 7. 50 <br /> Installment Payments For Each Front Foot: <br /> Down Payment with Application $ 2. 00 $ 3. 00 <br /> Six Subsequent Annual Payments each $ . 65 $ .95 <br /> Total Payment by Installments $ 5. 90 $ 8. 70 <br /> Minimum Total Charge Per Connection <br /> Regardless of Footage $200. 00 $300. 00 <br /> The required connection charge may be paid as a base single payment, or <br /> may be paid in installments by paying a down payment and six subsequent <br /> annual payments. The down payment shall accompany the application for the <br /> permit to tap or connect with the main or lateral. The succeeding annual <br /> installments shall become due, and are payable, on or before the annual <br /> anniversary date of the application. <br /> Exhibit A <br />