My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-115 PROJECT MANUAL 2016 MANHOLE REHABILITATION PROJECT (CITY PROJECT 2016-32)
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-115 ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH CULY CONTRACTING, INC. FOR 2016 MANHOLE REHABILITATION PROJECT CITY PROJECT 2016-32
>
R2016-115 PROJECT MANUAL 2016 MANHOLE REHABILITATION PROJECT (CITY PROJECT 2016-32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 10:40:08 AM
Creation date
10/19/2016 10:39:51 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-115
Res Ord Title
PROJECT MANUAL 2016 MANHOLE REHABILITATION PROJECT (CITY PROJECT 2016-32)
Approved Date
10/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' GENERAL CONDITIONS <br /> GC-2 CLEAN UP <br /> ' The Contractor shall at all times keep the premises free from accumulations of surplus <br /> excavated material, waste material or rubbish caused by their employees or work. <br /> ' Upon com letion of the work, the Contractor shall remove all their rubbish from and <br /> P <br /> about the structures, buildings, and premises, also all their tools, equipment, scaffolding and <br /> ' surplus materials, and shall leave their work clean, ready for use. In case of dispute, the Owner <br /> may remove the rubbish and surplus materials and charge cost of removals to the Contractor or <br /> � separate contractors, if any, in proportion to amounts determined by the Engineer to be just. <br /> GC-3 CONSTRUCTION STAKING <br /> ' The Engineer shall provide basic line and grade staking for construction. Such basic line <br /> and grade shall be limited in general to: <br /> ' (1) not more than two base lines (generally perpendicular to each other) and one bench <br /> mark for a building, a plant site or a major structure; and <br /> � (2) centerline stakes and offset grade stakes, where applicable, at all changes in <br /> direction, manhole location, special structure, or similar critical location, together <br /> � with bench marks, as may be necessary, along the line of work for utility <br /> distribution and transmission lines. <br /> � Any additional (detailed) construction staking shall be provided by the Contractor, who <br /> shall be fully responsible for transfer of data from the basic lines and grades provided by the <br /> Engineer. Detailed construction staking shall generally include such items as slope stakes, �� <br /> ' intermediate centerline stakes, additional offset grade stakes and similar work. The Contractor <br /> shall also be responsible for setting of all offsets, lines, string lines, reference points, reference <br /> grades, and similar control data required to execute the work under this contract. <br /> � The Contractor shall furnish all marking paint, stakes, hubs, lath or similar materials ��I <br /> necessary for additional (detailed) construction staking, and shall provide manual assistance I <br /> , (rodmen) to assist the Engineer in checking or confirming the detailed staking, to whatever <br /> extent the Engineer deems necessary. Such checking, or the absence of it, by the Engineer shall <br /> in no way relieve the Contractor from full responsibility for the accuracy and adequacy of the <br /> ' detailed construction staking. <br /> All costs of materials and labor occasioned by the Contractor's responsibilities as listed <br /> ' above, shall be borne by the Contractor and shall be included in the respective bid prices of the <br /> various items work. <br /> � <br /> ' <br /> ' <br /> , 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.