My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-115 PROJECT MANUAL 2016 MANHOLE REHABILITATION PROJECT (CITY PROJECT 2016-32)
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-115 ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH CULY CONTRACTING, INC. FOR 2016 MANHOLE REHABILITATION PROJECT CITY PROJECT 2016-32
>
R2016-115 PROJECT MANUAL 2016 MANHOLE REHABILITATION PROJECT (CITY PROJECT 2016-32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 10:40:08 AM
Creation date
10/19/2016 10:39:51 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-115
Res Ord Title
PROJECT MANUAL 2016 MANHOLE REHABILITATION PROJECT (CITY PROJECT 2016-32)
Approved Date
10/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS ' <br /> GC-4 CONTRACT WARRANTY , <br /> The Contractor shall guarantee all materials and equipment furnished and work <br /> performed for a period of one (1) year from the date of substantial completion. The Contractor � <br /> warrants and guarantees for a period of one (1) year from the date of substantial completion of <br /> the system that the completed system �s free from all defects due to faulty matenals or <br /> workmanship and the Contractor shall promptly make such corrections as may be necessary by ' <br /> reason of such defects, including the repairs of any damage to other parts of the system resulting <br /> from such defects. The Owner will give notice of observed defects with reasonable promptness. <br /> In the event that the Contractor should fail to make such repairs, adjustments or other work that � <br /> may be made necessary by such defects, the Owner may do so and charge the Contractor the cost <br /> thereby incurred. The Contract Bond shall remain in full force and effect through the guarantee <br /> period. ' <br /> GC-5 CONTRACTOR AVAILABILITY <br /> At all times when work is being performed (by Contractor himself or subcontractor), the ' <br /> prime Contractor shall have on the job site someone in their direct employ who is capable of <br /> meeting with the Engineer and making decisions. If authorized by the Engineer, this condition ' <br /> may be satisfied by having a telephone number or someone who satisfies the above <br /> requirements. <br /> GC-6 COORDINATION � <br /> Cooperation between the Contractor, City and Property Owners is imperative. The � <br /> responsibility and cost to maintain access is borne by the Contractor. The costs for temporary <br /> walks and driveways if necessary are to be incidental to the related bid items unless specifically <br /> paid as a separate item. , <br /> GC-7 DUST CONTROL <br /> As a part of their construction obligation, the Contractor shall make every reasonable ' <br /> effort to control dust throughout the construction area. Dirt, sand or other materials scattered <br /> over traveled areas shall be disposed of by sweeping, flushing or other appropriate measure. ' <br /> Temporary surfacing shall be continually maintained to avoid loose materials or dust pockets. <br /> GC-8 ESTIMATED QUANTITIES AND LOCATION CHANGES ' <br /> The quantities for this job are estimates only. These estimated quantities are used for <br /> establishing unit prices. The City reserves the right to increase, decrease, or omit any of the ' <br /> estimated quantities in this project. No additional compensation will be allowed for these <br /> changes. <br /> ' <br /> , <br /> ' <br /> 30 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.