Laserfiche WebLink
GENERAL CONDITIONS ' <br /> GC-18 PERMITS � <br /> It is the Contractor's responsibility to obtain all necessary permits. Any costs incurred in <br /> obtaining these permits are to be incidental to the related contract item. Permit fees will be waived � <br /> for those permits issued by the City of Decatur. <br /> GC-19 PHOTOGRAPHS OF EXISTING CONDITIONS ' <br /> The Contractor shall provide Digital video of existing facilities along the route or area of all <br /> construction, prior to the start of such construction. Construction of this facility will generally be , <br /> along street right-of-way containing trees, bushes, fences, driveways and similar items. Special <br /> attention shall be given to coverage of the entire easement and immediate adjacent areas which <br /> might be disturbed during construction. , <br /> The video shall be adequate to serve as a basis for comparison in determining whether the <br /> terms of the specifications with respect to replacements, restoration and/or preservation of existing <br /> surfaces have been complied with. One print of the videotape taken shall be given to the Engineer ' <br /> for his files. The cost for this item shall be included in the respective prices for the various items of <br /> work. <br /> GC-20 PREVAILING WAGE RATES ' <br /> The Contractor shall supply all weekly prevailing wage documentation, (weekly certified ' <br /> payroll) for both the prime Contractor and their subcontractors through ePrismSoft, an electronic <br /> web based compliance tracking software. City Engineering will monitor the payroll for compliance ' <br /> with the applicable "prevailing wage rates" as reguired in the Special Conditions of this contract. <br /> Access to ePrismSoft has been furnished by the City of Decatur. To activate access, the Prime ' <br /> Contractor and all subcontractors are to contact Human Capital Development at <br /> webnfo(a�eprismsoft.com or(309) 692-6400. <br /> GG21 PROJECT MAINTENANCE , <br /> Should the City become aware of an unsafe condition existing within the scope of this ' <br /> project, the City will attempt to contact the Contractor to resolve the unsafe condition. However, if <br /> the City is unable to contact the Contractor's designated representative or if the Contractor fails to <br /> respond within a reasonable period, the City will perform the necessary operations and the cost for ' <br /> labor, equipment and materials will be deducted from the contract. <br /> GG22 ROYALTIES, PATENTS AND COPYRIGHTS ' <br /> The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or <br /> claims for infringement of copyrights and patent rights and shall hold the Owner and Engineer ' <br /> harmless from loss on account thereof, but shall not be responsible for such defense or loss when a <br /> particular design, process or product of a particular manufacturer or manufacturers is required by <br /> the Contract Documents or where the copyright violations are contained in Drawings, Specifications ' <br /> or other documents prepared by the Owner or Architect. However, if the Contractor has reason to <br /> believe that the required design, process or product is an infringement of a copyright or a patent, the <br /> Contractor shall be responsible for such loss unless such information is promptly furnished to the , <br /> Architect. <br /> 34 � <br />