t': v.
<br /> Item Description �
<br /> Total
<br /> E-16 For the construction of the carbon slurry tank building,
<br /> approximately 40' x 20' in plan, with rei��forced concrete
<br /> substructure and foam lire netal panel s�.per�structure, in-
<br /> cluding al l architectural �,rork, b�.ii lding mechanical �-�ork,
<br /> building lighting and interior piping to iocations five
<br /> (5} feet outside of building walls, and all incidental and
<br /> appurtenant items , all complete in place as specified, for
<br /> the lump sum of , $ 61 ,000.00
<br /> E-17 For tfie �urnishing and installation of the freight elevator,
<br /> and a) 1 incidental and appurtenant items, all complete in
<br /> place as specified, for the lump sum of 30,000.00
<br /> E-18 For the furnishing and installation of all small and process
<br /> piping and plumbing, and al ) incidental and appurtenant items,
<br /> all complete in place as specified, for the lump sum of 85 000.00
<br /> �
<br /> E-19 For the furnishing and installation of all heating, air con-
<br /> ditioning, dehumidification and ventilating equipment, and all
<br /> incidental anc' appurtenant items, all complete in place as
<br /> specified, for the lump sum of 200,000,00
<br /> E-20 For the furnishing and instatlation of the three (3) 6 MGD
<br /> (rated capacity) mixing and softening rr�echanisms of the upflow
<br /> type, including all internal piping, baffles, anchor bolts,
<br /> drive units, weirs, walkways, supports, blowdown equipment,
<br /> timers, valves, and all incidental and appurtenant items, using
<br /> Permutit equipment, all complete in ptace as specified, for the .
<br /> lump sum of 500,000.00
<br /> E-21 For the furnishing and installation of four dry chemical feeders
<br /> for feeding lime and soda ash, complete with hoppers, storage
<br /> bins, solution pots and alt accessories as called for by the
<br /> specifications, flow sp) itter boxes, chemical piping, and all
<br /> incidental and appurtenant items, using Wallace and Tiernan
<br /> equipment, all complete in place as specified, for the lump sum of 60,000.00
<br /> E-22 For the furnishing and installation of one dry chemical feeder
<br /> for feeding coagulant, complete with hopper, solution pot,
<br /> individual dust collector and all accessories as called for
<br /> by the specifications, flow splitter box, chemical piping, and
<br /> all incidental and appurtenant items, using Wallace and Tiernan
<br /> equipment, all complete in place as specified, for the lump sum of 20,000.00
<br /> E-23 For the furnishing and installation of two dry chemical feeders '
<br /> for feeding sodium silicofluoride and polyphosphate, complete
<br /> with hopper, solution pots, individual dust collectors and all ac-
<br /> cessories as called for by the specifications, flow splitter box,
<br /> chemical piping, and all incidental and appurtenant items, usi�g
<br /> Wallace and Tiernan equipment, all complete in place as specified,
<br /> for the lump sum of 30,000.00
<br /> E-24 For the furnishing and instailation of the carbon dioxide and re-�'
<br /> carbonation system, including meters, regulating valves, diffus-
<br /> ors, piping, and allincidental and appurtenant items, all complete
<br /> in place as specified, for the lump sum of 40,000.00
<br /> E-25 For the furnishing and installation of the liquid alum feeding
<br /> system, including liquid alum storage tank accessories, pumps,
<br /> piping, and all incidental and appurtenant items, all complete in
<br /> place as specified, for the lump sum of 6,500.00
<br /> - 3 -