Laserfiche WebLink
t': v. <br /> Item Description � <br /> Total <br /> E-16 For the construction of the carbon slurry tank building, <br /> approximately 40' x 20' in plan, with rei��forced concrete <br /> substructure and foam lire netal panel s�.per�structure, in- <br /> cluding al l architectural �,rork, b�.ii lding mechanical �-�ork, <br /> building lighting and interior piping to iocations five <br /> (5} feet outside of building walls, and all incidental and <br /> appurtenant items , all complete in place as specified, for <br /> the lump sum of , $ 61 ,000.00 <br /> E-17 For tfie �urnishing and installation of the freight elevator, <br /> and a) 1 incidental and appurtenant items, all complete in <br /> place as specified, for the lump sum of 30,000.00 <br /> E-18 For the furnishing and installation of all small and process <br /> piping and plumbing, and al ) incidental and appurtenant items, <br /> all complete in place as specified, for the lump sum of 85 000.00 <br /> � <br /> E-19 For the furnishing and installation of all heating, air con- <br /> ditioning, dehumidification and ventilating equipment, and all <br /> incidental anc' appurtenant items, all complete in place as <br /> specified, for the lump sum of 200,000,00 <br /> E-20 For the furnishing and instatlation of the three (3) 6 MGD <br /> (rated capacity) mixing and softening rr�echanisms of the upflow <br /> type, including all internal piping, baffles, anchor bolts, <br /> drive units, weirs, walkways, supports, blowdown equipment, <br /> timers, valves, and all incidental and appurtenant items, using <br /> Permutit equipment, all complete in ptace as specified, for the . <br /> lump sum of 500,000.00 <br /> E-21 For the furnishing and installation of four dry chemical feeders <br /> for feeding lime and soda ash, complete with hoppers, storage <br /> bins, solution pots and alt accessories as called for by the <br /> specifications, flow sp) itter boxes, chemical piping, and all <br /> incidental and appurtenant items, using Wallace and Tiernan <br /> equipment, all complete in place as specified, for the lump sum of 60,000.00 <br /> E-22 For the furnishing and installation of one dry chemical feeder <br /> for feeding coagulant, complete with hopper, solution pot, <br /> individual dust collector and all accessories as called for <br /> by the specifications, flow splitter box, chemical piping, and <br /> all incidental and appurtenant items, using Wallace and Tiernan <br /> equipment, all complete in place as specified, for the lump sum of 20,000.00 <br /> E-23 For the furnishing and installation of two dry chemical feeders ' <br /> for feeding sodium silicofluoride and polyphosphate, complete <br /> with hopper, solution pots, individual dust collectors and all ac- <br /> cessories as called for by the specifications, flow splitter box, <br /> chemical piping, and all incidental and appurtenant items, usi�g <br /> Wallace and Tiernan equipment, all complete in place as specified, <br /> for the lump sum of 30,000.00 <br /> E-24 For the furnishing and instailation of the carbon dioxide and re-�' <br /> carbonation system, including meters, regulating valves, diffus- <br /> ors, piping, and allincidental and appurtenant items, all complete <br /> in place as specified, for the lump sum of 40,000.00 <br /> E-25 For the furnishing and installation of the liquid alum feeding <br /> system, including liquid alum storage tank accessories, pumps, <br /> piping, and all incidental and appurtenant items, all complete in <br /> place as specified, for the lump sum of 6,500.00 <br /> - 3 - <br />