<br /> Item Description Total I
<br /> E-6 For the construction of the fish screen for both intakes,
<br /> including all electrical and iiisulated connections , and for I
<br /> the construction of the ice meltinq system for the Slou�h
<br /> Bridge intake, including air line from rati•d water pumping �!
<br /> station to crib, and a) 1 other appurtenances, all complete
<br /> in place, for the lump sum of $ 25,000.00
<br /> Section 3 - Raw Water Station
<br /> E-7 For the construction of the raw water pump station building,
<br /> approximately 60' x 23 ' in plan, with reinforced concrete
<br /> substructure and foam line metal panel superstructure in- ''
<br /> cluding all architectural work, and all incidental and appur-
<br /> tenant items, a) 1 complete in place as specified, for the
<br /> lump sum of 300,000,00 I
<br /> E-8 F�r the furnishing and installation of two (2) 9000 gpm and
<br /> one (1) 4500 gpm raw water pumping units , including pumps, I
<br /> motors and motor stands, gauges, (starters and electric con-
<br /> trols not included) , and all incidental and appurtenant items, �I
<br /> using Worthington pumps and General Electric, Ideal , or equal
<br /> vertical motors, alt complete in place as specified, for the
<br /> lump sum of 50,000.00
<br /> E-9 For the furnishing and installation of piping, valves, fittings,
<br /> and other piping accessories in the raw water pump station
<br /> building and to a location five (5) feet outside building lines,
<br /> 2" building service line and all incidental and appurtenant
<br /> items, all complete in ptace as specified, for th� lump sum of 60,000.00
<br /> E-)0 For the furnishing and installation of heating, dehumidification
<br /> and drainage equipment and accessories, in the raw water pump
<br /> station building, and all incidental and appurtenant items, all
<br /> complete �n place as specified, for the lump sum of 30,000.00 �
<br /> E-11 For the furnishing and installation of chemical feeding equipment,
<br /> for the feeding of copper sulfate, chlorine and activated carbon,
<br /> and all incidental and appurtenant items, all complete in place
<br /> ' �s specified, for the lump sum of 20 000.00
<br /> ,
<br /> E-12 For the furnishing and installation of the electric power and
<br /> lighting system, in the raw water pump station, including main
<br /> power source to switchgear, 480 volt power feeder, 208 volt power
<br /> circuits and 110 volt power and light.ing circuits, and including
<br /> alt motor starters and controls, and all incidental and appurte-
<br /> nant items, all complete in place as specified, for the lump
<br /> sum of 50,000.00
<br /> SECTION 4 - NEW WATER TREATMENT PLANT
<br /> E-13 For the construct+on o t e new water treatmentplant building,
<br /> approximately 350' x 130' in plan, with reinforced concrete sub-
<br /> structure and foam line metal panel and glass window wall super-
<br /> structure, including a) 1 architectural work, building mechanical
<br /> work and other building accessories, and all incidental and appur- •
<br /> tenant items, all complete in place as specified, for the lump
<br /> ' sum of 1 ,625,000.00
<br /> E-14 Fcr the construction of the clarifier and softening basins, of
<br /> reinforced concrete, to accommodate Permutit equipment, all com-
<br /> plete in place as specified, for the lump sum of 442,500.00
<br /> E-15 For the construction of the recarbonation basins, approximately
<br /> 70' x 50' in plan, of reinforced concrete, including all mechani-
<br /> cal work, interior piping, exterior pipe to the main treatment
<br /> building, and all incidental and appurtenant items, all complete
<br /> in place as specified for the lump sum of 117,000.00 I
<br /> - 2 - �
<br />
|