Laserfiche WebLink
, r � <br /> .1. - 'a. ..� T <br /> � <br /> . , j <br /> CONTRACT <br /> THIS CONTRACT, Made the �� ,o� day of C� A D 1 2 <br /> by and between C & C;BpHREp,, INCo, 4025 industriai Road, For ayne' Indiana� 46vC1, � <br /> hereinafter called the "Contractor," and CITY OF DECATUR, Ma n County, Illinois, <br /> hereinafter called the "Owner," <br /> WITNESSETH, That the Contractor and the Owner for the consideration stated herein agree <br /> as fotlows; <br /> ARTICLE I. SCOPE OF WORK - The Contractor shall perform everything required to be <br /> performed and shali provide and furnish all of the labor, materials, necessary tools, <br /> expendable equipment, and a11 utility and transportation services required to perform <br /> and complete in a workmanlike manner all the work required in connection with the <br /> construction of the <br /> WATER SYSTEM IMPROVEMENTS - DIVISION E - NE4! WATER TREATMENT PLANT <br /> CITY PROJECT N0. 5-72 <br /> of the Owner, all in strict accordance with the plans and specifications, including any <br /> and all addenda prepared by Warren &� Van Praag, Inc. , Consulting Engineers, acting fo�- <br /> the Owner, and in these contract documents referred to as the Architect-Engineer, which <br /> plans and specifications are made a part of this contract; and in strict compliance <br /> with the Contractor's proposal and the other contract documents herein mentioned which <br /> are a part of this contract; and the Contractor shal ) do everything required by this <br /> contract and the other documents consfiituting a part thereof. <br /> ARTICLE II� THE CONTRACT PRICE - The Owner shall pay to the Contractor for the per- <br /> formance of this contract, subject to any additions or deductions provided therein, in <br /> current funds, the contract price computed as follows; <br /> DIVISION E - NEW WATER TREATMENT PLANT <br /> Section 1 - Site Preparation <br /> Item Description Tota1 <br /> E-1 For the clearing of the water treatment plant site, includ- <br /> ing the sludge bed area, of all trees, unreserved buildings, <br /> • vegetation, rubbish, foundations, fences and other obstruc- <br /> tions, and the grubbing of tree stumps and other below <br /> ground deteterious matter, to the limits specified for the <br /> lump sum of '$ 100,000,00 <br /> E-2 244,400 cubic yards, more or less, of earth excavation for <br /> lagoons, roadway, general grading, including stripping and <br /> removai of unsuitable materials (except that included in <br /> Item E-3, special earth excavation for structures of unsuit- <br /> able or deleterious material) for the unit price per cubic <br /> yard of $1 .00 244,400.00 <br /> E-3 3,000 cubic yards, more or less, of earth excavation (Special) <br /> for structures of unsuitable or deleterious material lying <br /> beneath the granular fill earth subgrade or the granular sub- ' <br /> base earth subgrade for the unit price per cubic yard of $2.00 6,000.00 <br /> Section 2 - Raw Water Intake & Pipeline <br /> E-�+ For the constr•uction of the two (2) intake cribs in Lake Deca- <br /> tur, including sheet piling, excavation, reinforced concrete, <br /> grating, log collar, and other appurtenant items, complete in <br /> place as specified for the lump sum of 50,000.00 <br /> E'S 1500 lineal feet, more or less: of thirty-six (3�) inch ;e�n- <br /> forced concrete pipe, from raH� water pu;nping station to intake <br /> cribs including all fittings and bedding, complete in place as <br /> specified, for the unit price per lineal foot of $85.00 127,500.00 <br /> - 1 - <br /> i <br />