<br /> Item Desci-iption Total
<br /> E-81 6200 square yards , rnore or less , oi P. C. Concrete Paver7ent,
<br /> using 8-inch thick s ',-,;, ;� I1 cor,��lete ir place �s specified ,
<br /> for the unit �ric� ���r �q�.:�rt� �yard cf $ 10.00 S o2,000. :�C'
<br /> E-82 1300 square y3rds , n��ore or less, of P. C. Concrete Pavement,
<br /> using b- inch thick slab, all coinplete in place as specified,
<br /> for the unit price per squai-e yard of $9.00 11 ,700.00
<br /> E-83 1550 square yards , more or less, of Bituminous Pavement, using
<br /> A-3 surface treatment on &-inch Aggreg�ate Base Course, Type B,
<br /> all complete in place as specified , for the unit price per
<br /> square yard of $3.50 5,425,pp
<br /> E-84 2070 square yards , more or less, of Bituminous Pavement, using
<br /> A-3 surface treatment on 10-inch Aggregate Base Course, Type B,
<br /> all complete in place as specified, for the unit price per
<br /> square yard of $4,00 8,280.00
<br /> E-85 1250 lineal feet, more or less , of Curb and G�tter, various widths,
<br /> atl complete in place as specified , for the unit price per lineal
<br /> foot of $5°00 6,250.00
<br /> E-�86 2000 square feet, more or less, of 6" concrete sidewalk, all com-
<br /> plete in place as specified, for the unit price per square foot
<br /> of $1 .00 2,000.00
<br /> E-87 514 lineal feet, more or less, of Paved Ditch, both types, corn-
<br /> plete in place as specified, for the unit price per lineal
<br /> ' foot of $8.00 4, 112.00
<br /> E-88 324 lineal feet, more or less , of Steel Plate Beam Guard Rail ,
<br /> including posts and atl other appurtenances, complete in place
<br /> as specified, for the unit price per lineal foot of $7.00 2,268.00
<br /> E-89 4600 lineal feet, more or less, of fencing around the plant site,
<br /> including ; - 24-foot gates, all complete in place as specified,
<br /> for the unit price per lineal foot of $5.00 23,000.00
<br /> E-90 For the spreading of topsoil , seeding and landscaping of the
<br /> entire plant area, including the sludge lagoon area, all complete
<br /> as specified, for the lumo sum of 40,OOG.00
<br /> Total Bid, Items E-1 to E-90, inclusive, including
<br /> all Base Bid Items with the exception that Alternate
<br /> Item E-30a is substituted $7,319, 140.00
<br /> ARTICLE III. UNIT PRICES FOR CHANGES - The following unit prices will apply, if �
<br /> �er�uired, in the event of additions to or deductions from the work to be performed under
<br /> this contract.
<br /> Type of Work Unit .Price
<br /> Add Deduct
<br /> ' CAISSONS
<br /> I_ength of Shaft Excavation L.F. $ 10.00 $ 3.50
<br /> Length of Casing Installed L.F, 4.00 -
<br /> Length of !'asing Left in Place L.F. 17.00 -
<br /> Volume of Concrete C.Y. 25.00 18.00
<br /> Compacted Granular Fill for Structures C.Y. 10.00 4.00
<br /> Structural Concrete - Formed C.Y. 175.00 100,00
<br /> Structural Concrete - Unformed C.Y. 75.00 40.00
<br /> Fill Concrete ,- Unformed C.Y. 50.00 30.00
<br /> Filled Concrete - Formed C.Y. 100.00 50.00
<br /> Reinforcing Stee� Lb. 0.25 0. 10
<br /> Structural Steel Lb. 0.50 0.25
<br /> . Cast Iron Pipe and Fittings Lb. 0.50 0.35
<br /> Steel Pipe and Fittings Lb. 1 .25 0.80
<br /> Cast Iron Soil Pipe and Fittings Lb. 0.50 0.35
<br /> Steel Sheet Piling left in place T. 700.00 -