Laserfiche WebLink
ARTICLE 1 GENERAL PROVISIONS <br /> § 1.1 BASIC DEFINITIONS <br /> § 1.1.1 THE CONTRACT DOCUMENTS <br /> The Contract Documents are enumerated in the Agreement between the Owner and Contractor(hereinafter the <br /> Agreement)and consist of the Agreement,Conditions of the Contract(General,Supplementary and other <br /> Conditions),Drawings,Specifications,Addenda issued prior to execution of the Contract,other documents listed in <br /> the Agreement and Modifications issued after execution of the Contract.A Modification is(1)a written amendment <br /> to the Contract signed by both parties,(2)a Change Order,(3)a Construction Change Directive or(4)a written <br /> order for a minor change in the Work issued by the Architect. Unless specifically enumerated in the Agreement,the <br /> Contract Documents do not include the advertisement or invitation to bid,Instructions to Bidders,sample forms, <br /> other information furnished by the Owner in anticipation of receiving bids or proposals,the Contractor's bid or <br /> proposal,or portions of Addenda relating to bidding requirements. <br /> § 1.1.2 THE CONTRACT <br /> The Contract Documents form the Contract for Construction.The Contract represents the entire and integrated <br /> agreement between the parties hereto and supersedes prior negotiations,representations or agreements,either written <br /> or oral.The Contract may be amended or modified only by a Modification.The Contract Documents shall not be <br /> construed to create a contractual relationship of any kind(1)between the Contractor and the Architect or the <br /> Architect's consultants,(2)between the Owner and a Subcontractor or a Sub-subcontractor,(3)between the Owner <br /> and the Architect or the Architect's consultants or(4)between any persons or entities other than the Owner and the <br /> Contractor.The Architect shall,however,be entitled to performance and enforcement of obligations under the <br /> Contract intended to facilitate performance of the Architect's duties. <br /> § 1.1.3 THE WORK <br /> The term"Work"means the construction and services required by the Contract Documents,whether completed or <br /> partially completed,and includes all other labor,materials,equipment and services provided or to be provided by <br /> the Contractor to fulfill the Contractor's obligations.The Work may constitute the whole or a part of the Project. <br /> § 1.1.4 THE PROJECT <br /> The Project is the total construction of which the Work performed under the Contract Documents may be the whole <br /> or a part and which may include construction by the Owner and by separate contractors. <br /> § 1.1.5 THE DRAWINGS <br /> The Drawings are the graphic and pictorial portions of the Contract Documents showing the design,location and <br /> dimensions of the Work,generally including plans,elevations,sections,details, schedules and diagrams. <br /> § 1.1.6 THE SPECIFICATIONS <br /> The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, <br /> equipment,systems,standards and workmanship for the Work,and performance of related services. <br /> § 1.1.7 INSTRUMENTS OF SERVICE <br /> Instruments of Service are representations,in any medium of expression now known or later developed,of the <br /> tangible and intangible creative work performed by the Architect and the Architect's consultants under their <br /> respective professional services agreements.Instruments of Service may include,without limitation,studies, <br /> surveys,models,sketches,drawings,specifications,and other similar materials. <br /> § 1.1.8 INITIAL DECISION MAKER <br /> The Initial Decision Maker is the person identified in the Agreement to render initial decisions on Claims in <br /> accordance with Section 15.2 and certify termination of the Agreement under Section 14.2.2. <br /> § 1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS <br /> § 1.2.1 The intent of the Contract Documents is to include all items necessary for the proper execution and <br /> completion of the Work by the Contractor.The Contract Documents are complementary,and what is required by <br /> one shall be as binding as if required by all;performance by the Contractor shall be required only to the extent <br /> consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the <br /> indicated results. <br /> AIA Document A201 T'"—2007.Copyright©1911,1915,1918,1925,1937,1951,1958,1961,1963,1966,1970,1976,1987,1997 and 2007 by The American <br /> Init. Institute of Architects.All rights reserved.WARNING:This AIA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized 10 <br /> reproduction or distribution of this AIA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to <br /> the maximum extent possible under the law.This document was produced by AIA software at 15:14:50 on 11/01/2016 under Order No.4982744446_1 which <br /> expires on 07/01/2017,and is not for resale. <br /> User Notes: (2035499384) <br />