Laserfiche WebLink
§ 1.2.2 Organization of the Specifications into divisions,sections and articles,and arrangement of Drawings shall <br /> not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be <br /> performed by any trade. <br /> § 1.2.3 Unless otherwise stated in the Contract Documents,words that have well-known technical or construction <br /> industry meanings are used in the Contract Documents in accordance with such recognized meanings. <br /> § 1.3 CAPITALIZATION <br /> Terms capitalized in these General Conditions include those that are(1)specifically defined,(2)the titles of <br /> numbered articles or(3)the titles of other documents published by the American Institute of Architects. <br /> § 1.4 INTERPRETATION <br /> In the interest of brevity the Contract Documents frequently omit modifying words such as"all"and "any"and <br /> articles such as"the"and"an,"but the fact that a modifier or an article is absent from one statement and appears in <br /> another is not intended to affect the interpretation of either statement. <br /> § 1.5 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND OTHER INSTRUMENTS OF SERVICE <br /> § 1.5.1 The Architect and the Architect's consultants shall be deemed the authors and owners of their respective <br /> Instruments of Service,including the Drawings and Specifications,and will retain all common law, statutory and <br /> other reserved rights,including copyrights.The Contractor,Subcontractors,Sub-subcontractors,and material or <br /> equipment suppliers shall not own or claim a copyright in the Instruments of Service. Submittal or distribution to <br /> meet official regulatory requirements or for other purposes in connection with this Project is not to be construed as <br /> publication in derogation of the Architect's or Architect's consultants'reserved rights. <br /> § 1.5.2 The Contractor,Subcontractors,Sub-subcontractors and material or equipment suppliers are authorized to <br /> use and reproduce the Instruments of Service provided to them solely and exclusively for execution of the Work.All <br /> copies made under this authorization shall bear the copyright notice,if any,shown on the Instruments of Service. <br /> The Contractor,Subcontractors,Sub-subcontractors,and material or equipment suppliers may not use the <br /> Instruments of Service on other projects or for additions to this Project outside the scope of the Work without the <br /> specific written consent of the Owner,Architect and the Architect's consultants. <br /> § 1.6 TRANSMISSION OF DATA IN DIGITAL FORM <br /> If the parties intend to transmit Instruments of Service or any other information or documentation in digital form, <br /> they shall endeavor to establish necessary protocols governing such transmissions,unless otherwise already <br /> provided in the Agreement or the Contract Documents. <br /> ARTICLE 2 OWNER <br /> § 2.1 GENERAL <br /> § 2.1.1 The Owner is the person or entity identified as such in the Agreement and is referred to throughout the <br /> Contract Documents as if singular in number.The Owner shall designate in writing a representative who shall have <br /> express authority to bind the Owner with respect to all matters requiring the Owner's approval or authorization. <br /> Except as otherwise provided in Section 4.2.1,the Architect does not have such authority.The term"Owner"means <br /> the Owner or the Owner's authorized representative. <br /> § 2.1.2 The Owner shall furnish to the Contractor within fifteen days after receipt of a written request,information <br /> necessary and relevant for the Contractor to evaluate,give notice of or enforce mechanic's lien rights. Such <br /> information shall include a correct statement of the record legal title to the property on which the Project is located, <br /> usually referred to as the site,and the Owner's interest therein. <br /> § 2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER <br /> § 2.2.1 Prior to commencement of the Work,the Contractor may request in writing that the Owner provide <br /> reasonable evidence that the Owner has made financial arrangements to fulfill the Owner's obligations under the <br /> Contract.Thereafter,the Contractor may only request such evidence if(1)the Owner fails to make payments to the <br /> Contractor as the Contract Documents require;(2)a change in the Work materially changes the Contract Sum;or(3) <br /> the Contractor identifies in writing a reasonable concern regarding the Owner's ability to make payment when due. <br /> The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or <br /> Init. AIA Document A201 T —2007.Copyright©1911,1915,1918,1925,1937,1951,1958,1961,1963,1966,1970,1976,1987,1997 and 2007 by The American <br /> Institute of Architects.All rights reserved.WARNING:This AIA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized 1 <br /> reproduction or distribution of this AIA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to <br /> the maximum extent possible under the law.This document was produced by AIA software at 15:14:50 on 11/01/2016 under Order No.4982744446 1 which <br /> expires on 07/01/2017,and is not for resale. <br /> User Notes: <br /> (2035499384) <br />