|
§ 3.11 DOCUMENTS AND SAMPLES AT THE SITE
<br /> The Contractor shall maintain at the site for the Owner one copy of the Drawings,Specifications,Addenda, Change
<br /> Orders and other Modifications,in good order and marked currently to indicate field changes and selections made
<br /> during construction,and one copy of approved Shop Drawings, Product Data,Samples and similar required
<br /> submittals.These shall be available to the Architect and shall be delivered to the Architect for submittal to the
<br /> Owner upon completion of the Work as a record of the Work as constructed.
<br /> § 3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
<br /> § 3.12.1 Shop Drawings are drawings,diagrams,schedules and other data specially prepared for the Work by the
<br /> Contractor or a Subcontractor,Sub-subcontractor,manufacturer,supplier or distributor to illustrate some portion of
<br /> the Work.
<br /> § 3.12.2 Product Data are illustrations,standard schedules,performance charts,instructions,brochures,diagrams
<br /> and other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work.
<br /> § 3.12.3 Samples are physical examples that illustrate materials,equipment or workmanship and establish standards
<br /> by which the Work will be judged.
<br /> § 3.12.4 Shop Drawings,Product Data, Samples and similar submittals are not Contract Documents.Their purpose
<br /> is to demonstrate the way by which the Contractor proposes to conform to the information given and the design
<br /> concept expressed in the Contract Documents for those portions of the Work for which the Contract Documents
<br /> require submittals. Review by the Architect is subject to the limitations of Section 4.2.7.Informational submittals
<br /> upon which the Architect is not expected to take responsive action may be so identified in the Contract Documents.
<br /> Submittals that are not required by the Contract Documents may be returned by the Architect without action.
<br /> § 3.12.5 The Contractor shall review for compliance with the Contract Documents,approve and submit to the
<br /> Architect Shop Drawings,Product Data,Samples and similar submittals required by the Contract Documents in
<br /> accordance with the submittal schedule approved by the Architect or,in the absence of an approved submittal
<br /> schedule,with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of
<br /> the Owner or of separate contractors.
<br /> § 3.12.6 By submitting Shop Drawings,Product Data,Samples and similar submittals,the Contractor represents to
<br /> the Owner and Architect that the Contractor has(1)reviewed and approved them,(2)determined and verified
<br /> materials,field measurements and field construction criteria related thereto,or will do so and(3)checked and
<br /> coordinated the information contained within such submittals with the requirements of the Work and of the Contract
<br /> Documents.
<br /> § 3.12.7 The Contractor shall perform no portion of the Work for which the Contract Documents require submittal
<br /> and review of Shop Drawings,Product Data,Samples or similar submittals until the respective submittal has been
<br /> approved by the Architect.
<br /> § 3.12.8 The Work shall be in accordance with approved submittals except that the Contractor shall not be relieved
<br /> of responsibility for deviations from requirements of the Contract Documents by the Architect's approval of Shop
<br /> Drawings, Product Data,Samples or similar submittals unless the Contractor has specifically informed the Architect
<br /> in writing of such deviation at the time of submittal and(1)the Architect has given written approval to the specific
<br /> deviation as a minor change in the Work,or(2)a Change Order or Construction Change Directive has been issued
<br /> authorizing the deviation.The Contractor shall not be relieved of responsibility for errors or omissions in Shop
<br /> Drawings,Product Data,Samples or similar submittals by the Architect's approval thereof.
<br /> § 3.12.9 The Contractor shall direct specific attention,in writing or on resubmitted Shop Drawings,Product Data,
<br /> Samples or similar submittals,to revisions other than those requested by the Architect on previous submittals. In the
<br /> absence of such written notice,the Architect's approval of a resubmission shall not apply to such revisions.
<br /> § 3.12.10 The Contractor shall not be required to provide professional services that constitute the practice of
<br /> architecture or engineering unless such services are specifically required by the Contract Documents for a portion of
<br /> the Work or unless the Contractor needs to provide such services in order to carry out the Contractor's
<br /> responsibilities for construction means,methods,techniques,sequences and procedures.The Contractor shall not be
<br /> AIA Document A201 TM—2007.Copyright©1911,1915,1918,1925,1937,1951,1958,1961,1963,1966,1970,1976,1987,1997 and 2007 by The American
<br /> Init. Institute of Architects.All rights reserved.WARNING:This AIA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized 16
<br /> reproduction or distribution of this AIA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to
<br /> the maximum extent possible under the law.This document was produced by AIA software at 15:14:50 on 11/01/2016 under Order No.4982744446_1 which
<br /> expires on 07/01/2017,and is not for resale.
<br /> User Notes: (2035499384)
<br />
|