R2017-02 Agreement with BWC Nelson Park Neighborhood CP 2012-22
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-02 Agreement with BWC Nelson Park Neighborhood CP 2012-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 3:42:58 PM
Creation date
1/20/2017 3:42:56 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-02
Res Ord Title
Agreement with BWC for Nelson Park Neighborhood Combined Sewer Separation Project CP 2012-22
Department
Public Works
Approved Date
1/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f r <br /> r <br /> 7. Completion Time. Complete the bidding phase and prepare and submit the recommendation to <br /> the City's Representative for the award of the Contract(s)within the time period set forth in <br /> Exhibit C, Project Timeline. <br /> B. CONSTRUCTION SURVEY AND LAYOUT PHASE. <br /> The Consulting Engineer or Surveyor shall, after written authorization to proceed with the <br /> Construction Survey and Layout Phase: <br /> 1. Duties. The Consulting Engineer or Surveyor shall provide horizontal and vertical control line <br /> and grade to enable construction of the improvement as depicted in the Project plans. The <br /> number of control points to be established by the Consulting Engineer or Surveyor shall be <br /> sufficient to permit the construction contractor("Contractor")to construct the improvement <br /> within the construction tolerances established in the Project specifications. In addition,the <br /> number of control points shall be consistent with standard engineering practice. <br /> 2. Replacement of Lost Control Points. Control points which are lost, damaged, removed or <br /> otherwise moved by the Contractor or others shall be promptly replaced by the Consulting <br /> Engineer or Surveyor and costs for such replacement shall be computed on a time and materials <br /> basis, and reimbursed by the City or its construction contractor. <br /> 3. Accuracv. The Consulting Engineer or Surveyor shall provide the horizontal and vertical control <br /> points within the same measurement tolerances as the construction tolerances established in the <br /> Project specifications. The Consulting Engineer or Surveyor shall be responsible for the accuracy <br /> of the control points which are established. The Consulting Engineer or Surveyor shall be <br /> responsible for costs which may result from errors by the Consulting Engineer or Surveyor in <br /> placement of control points. <br /> The Consulting Engineer or Surveyor shall take all reasonable and customary actions to protect <br /> the control points established by the Consulting Engineer or Surveyor. <br /> 4. Completion Time. The Construction Survey and Layout Phase shall be completed within the <br /> time period set forth in Exhibit C,Project Timeline. <br /> C. CONSTRUCTION INSPECTION PHASE. <br /> The Consulting Engineer shall, after written authorization to proceed with the Construction Inspection <br /> Phase: <br /> 1. General Duties. The Consulting Engineer shall consult with and advise the City's Representative <br /> and act as its representative as provided herein and in the General Conditions of the construction <br /> contract for the Project. The primary responsibility of the Consulting Engineer in this phase of <br /> the work shall be quality control inspection of the materials, construction methods and techniques <br /> to assure that the Contractor builds the project in accordance with the plans and specifications. <br /> 2. Construction Inspection and Reporting. The Consulting Engineer shall make visits to the site at <br /> intervals appropriate to the various stages of construction to observe as an experienced and <br /> qualified design professional the progress and quality of the executed work of the Contractor and <br /> to determine in general if such work is proceeding in accordance with the Contract Documents. <br /> During such visits and on the basis of on-site observations,the Consulting Engineer shall keep the <br /> City's Representative informed of the progress of the work, shall endeavor to guard the City <br /> against defects and deficiencies in such work and may disapprove or reject work failing to <br /> conform to the Contract Documents. Formal notification of the progress of work shall be in the <br /> form of bi-weekly project progress meetings held between the Consulting Engineer, Contractor <br /> Last Revised:04/29/2015 <br />