Laserfiche WebLink
Addenda Nos. 1 through 4 have also been reviewed and have been found acceptable. A <br /> supplemental permit is not required for these addenda. <br /> You are reminded that it is your responsibility as the loan recipient to maintain copies of the bids <br /> for all firms that bid on prime contracts, or provide quotes on subcontracts in accordance with <br /> the Standard Conditions. It is also your responsibility to obtain copies of all subcontracts <br /> awarded by the prime contractor and verify these contracts conform to the Standard Conditions. <br /> And finally, if a Pre-Construction Conference is to be held on your project, please contact the <br /> appropriate Illinois EPA Regional Office located in Champaign at 217/278-5800 with the time <br /> and place of the meeting. Regional office personnel will be conducting interim and final <br /> inspections during the construction of your project. <br /> If you have any questions regarding this project, please contact George Lambert, the project <br /> manager, Infrastructure Financial Assistance Section, at 217/782-2027. <br /> Congratulations on the receipt of this Loan Agreement and we look forward to working with you <br /> during the project. <br /> Cordially, <br /> PcMssina <br /> Director <br /> AM:GL <br /> n:\bow\grants\com_docs\lambert\projects\decatur 5315\ww loan agreement cover letter april 2017.docx <br /> Attachments <br /> cc: Clerk, City of Decatur <br /> Troy Hall, Engineer, City of Decatur <br /> Paul Caswell, Assistant Engineer, City of Decatur <br />