My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01 Authorizing to Borrow from Water Pollution Control Revolving Loan Fund
COD
>
City Clerk
>
ORDINANCES
>
2017
>
2017-01 Authorizing to Borrow from Water Pollution Control Revolving Loan Fund
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2017 2:04:46 PM
Creation date
1/25/2017 4:24:36 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2017-01
Res Ord Title
Authorizing to borrow funds from the Water Pollution Control Revolving Loan Fund
Department
Public Works
Approved Date
1/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Memorandum <br /> NO. 2017-01 <br /> DATE: January 3,2017 <br /> TO: Honorable Mayor Moore Wolfe and City Council Members <br /> FROM: Tim Gleason, City Manager <br /> Richard G. Marley, P. E., Public Works Director <br /> SUBJECT: Nelson Park Neighborhood Combined Sewer Separation Project <br /> City Project 2012-22 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the following items relating to the separation <br /> of the Nelson Park Neighborhood Sewers: <br /> 1. Ordinance authorizing a loan agreement to borrow up to $4,844,000 from the Water Pollution <br /> Control Loan Program which is administered by the Illinois Environmental Protection Agency <br /> (IEPA). The proposed loan will cover engineering and construction costs associated with the <br /> separation of the Nelson Park Neighborhood Combined Sewers. <br /> 2. Resolution authorizing an Engineering Services Agreement between the City of Decatur and Blank, <br /> Wesselink, Cook, and Associates, Inc. (BWC) to provide construction engineering and resident <br /> inspection services for the separation of the Nelson Park Neighborhood Sewers for a fee not to <br /> exceed$318,985. <br /> PRIOR COUNCIL ACTION: <br /> May 7,2012—City Council approved Resolution R2012-102, authorizing an agreement with BWC <br /> to begin the preliminary design for the Nelson Park Neighborhood Storm Sewer Design project for a <br /> fee not to exceed $80,513. <br /> November 16,2015—City Council approved Resolution R2015-127, authorizing an agreement with <br /> BWC to begin the final design for the Nelson Park Neighborhood Storm Sewer Design project for a <br /> fee not to exceed $147,000. <br /> STORM DRAINAGE PRIORITIES: <br /> The 2009 Stormwater Master Plan addresses three main topics: <br /> 1. Stormwater Problem Area Prioritization <br /> 2. Regulation, Standards, and Policies <br /> 3. Stormwater Expenditures and Funding Mechanisms <br /> In April, 2014,the City Council approved a Stormwater Utility to provide a dedicated funding source to <br /> improve known drainage problems and to improve maintenance on existing stormwater facilities. The <br /> Nelson Park Neighborhood Combined Sewer Separation design project addresses item 1 above by <br /> — 1 — <br />
The URL can be used to link to this page
Your browser does not support the video tag.