2017-01 Authorizing to Borrow from Water Pollution Control Revolving Loan Fund
COD
>
City Clerk
>
ORDINANCES
>
2017
>
2017-01 Authorizing to Borrow from Water Pollution Control Revolving Loan Fund
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2017 2:04:46 PM
Creation date
1/25/2017 4:24:36 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2017-01
Res Ord Title
Authorizing to borrow funds from the Water Pollution Control Revolving Loan Fund
Department
Public Works
Approved Date
1/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
targeting the Nelson Park Neighborhood's ongoing storm drainage problems which were identified as <br /> the#2 storm water mitigation priority in the City's stormwater master plan. This project will also <br /> separate sanitary sewage from storm water drainage. Separating the two types of sewer flow will reduce <br /> basement backups and combined sewer overflows into the Sangamon River. <br /> BACKGROUND: <br /> In 1966, a drainage study was completed for the City in an effort to plan for the drainage of future <br /> developments and to identify drainage projects for the City to undertake in the near term. During the <br /> late 1970's and early 1980's the City invested nearly$20 million in drainage improvements throughout <br /> the City. The Nelson Park Neighborhood was identified as a needed future project with residents on <br /> nearly every street reporting street and basement flooding; however, this work was never completed. <br /> More recently, the City's 2009 Stormwater Master Plan once again identified the Nelson Park <br /> Neighborhood as a high priority for drainage, listing it as 2nd out of 46 identified priority areas to <br /> address. Based on preliminary designs, the cost estimate is about $4.8 million with engineering costs <br /> included. The project was then put on hold until sufficient funding could be identified. <br /> Knowing that the project costs would exceed the City's ability to fund out of current revenue, the City <br /> approached the Illinois Environmental Protection Agency(IEPA) and inquired about a low interest loan <br /> similar to those the City has recently taken advantage of for high cost sanitary sewer repairs. The IEPA <br /> indicated that this project was loan eligible. The City then prepared and submitted a Facilities Plan for <br /> the Nelson Park Neighborhood that identified the storm drainage problems, outlined the proposed <br /> project to resolve them, and estimated the possible project costs. <br /> Project Funding Through the Water Pollution Control Loan Program <br /> The passage of an ordinance authorizing a loan agreement to borrow funds from the Illinois Water <br /> Pollution Control Loan Program is one of the final steps in securing an IEPA low interest loan. The loan <br /> rate is expected to be 1.75%. The ordinance addresses the funding for the project and assures that the <br /> City is able to repay the loan over a 20 year period beginning at the substantial completion of the <br /> project. The funds included in the loan request are summarized in the following table: <br /> Work Item Project Estimate <br /> Design Engineering $244,000 <br /> Construction $4,156,325 <br /> Construction Contingency 3% 124,690 <br /> Construction Engineering $318,985 <br /> Total Estimated Project Cost $4,844,000 <br /> Total Loan Requested $4,844,000 <br /> As is common with the Water Pollution Control Loan Program, the actual loan document will not be <br /> fully written until a contract has been awarded by the City Council and a bid amount is approved by the <br /> IEPA. At that point, the agreement authorized by the attached ordinance will be signed by the City <br /> Manager and the loan activated. The contractor will then be given a notice to proceed. <br /> — 2 — <br />