My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-25 Agreement with ADS Environemtnal for 2017 Target Area Flow Monitoring
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-25 Agreement with ADS Environemtnal for 2017 Target Area Flow Monitoring
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 4:29:56 PM
Creation date
2/24/2017 4:08:16 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-25
Res Ord Title
Agreement with ADS Environmental Services for 2017 Target Area Flow Monitoring Project CP 2017-01
Department
Public Works
Approved Date
2/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Qualifications and Proposals (RFQP) <br /> The City of Decatur advertised a RFQP to provide professional services for the 2017 Target Area <br /> Flow Monitoring Services on November 10, 2016. On December 7, 2016 the City received <br /> proposals from the following firms: <br /> 1. ADS Environmental Services, Chicago, IL <br /> 2. AECOM, Chicago, IL <br /> 3. Donohue and Associates, Champaign, IL <br /> 4. RJN Group, Wheaton, IL <br /> City staff reviewed the proposals and interviewed ADS Environmental Services and RJN Group. <br /> Staff recommends Council approve a Professional Service Agreement with ADS Environmental <br /> Services as the firm best qualified to perform the work. <br /> Flow MonitoringServices Program <br /> ram g <br /> A flow monitoring services program will provide the City with dry weather and wet weather sewer <br /> flows within the collection system. The program includes the following to assist the City. <br /> 1. Site Reconnaissance—ADS will review system maps, select metering location, and <br /> visit site to verify the site is suitable for a flow meter installation. <br /> 2. Flow Meter Installation—Equipment will be installed and calibrated as per industry <br /> standards. <br /> 3. Rain Gauge Installation— 15 guages will be installed and calibrated as per industry <br /> standards. <br /> 4. Data Collection and Maintenance—Data will be transmitted wirelessly to a remote <br /> server for review and approval by a data analyst. ADS will provide all maintenance <br /> on the equipment during the project period. <br /> 5. Final Report—ADS will provide raw flow data with a Rainfall Derived Inflow and <br /> Infiltration (RDII) Report. An RDII Report will provide hydraulic performance <br /> evaluation, dry weather analysis, wet weather analysis, Basin rankings and <br /> recommendations. <br /> A� . <br /> Target Area Basins Flow Monitoring <br /> The Target Area Basins Flow monitoring will �f" - 1. M <br /> install approximately 86 flow meters with the <br /> following 9 basins. Detailed basin maps can be == <br /> found in Exhibits A-I. 4 ' <br /> 1. South Hampton Rd <br /> 2. East William Street Rd `? ° '"� .� ^�° <br /> 3. Lost Bridge North <br /> 4. Lost Bridge South <br /> 5. Sesom Dr <br /> E - <br /> 6. West Main St <br /> 7. Florian Ave <br /> 8. Lynette Dr Y <br /> 9. Basin 5 and 6 <br /> p 31mt8r1°°WeM •� <br /> - 2 — <br />
The URL can be used to link to this page
Your browser does not support the video tag.