Laserfiche WebLink
Exhibit A <br /> SCOPE OF WORK <br /> EXHIBIT A-1 <br /> CITY OF DECATUR—DEPARTMENT OF PUBLIC WORKS <br /> LOST BRIDGE NORTH (TA 3N)AND FLORIAN (TA 6) BASINS— <br /> SANITARY SEWER ALTERNATIVES ANALYSIS/SSO ELIMINATION REPORT <br /> SCOPE OF PROFESSIONAL SERVICES FOR CRAWFORD, MURPHY & TILLY, INC. <br /> BACKGROUND <br /> The United States Environmental Protection Agency(USEPA)has drafted an Administrative Consent <br /> Order(ACO) (Docket No.V-W-12-AO-21) for the City of Decatur under Sections 308(a)and 309(a)of <br /> the Clean Water Act(CWA) in regards to documented sanitary sewer overflows(SSOs),which are <br /> prohibited by the CWA. SSOs are defined by the ACO as any sanitary sewer discharge into waters of the <br /> US and into public or private property, such as backups. <br /> Target Areas(TA) of the City that have to be addressed within the ACO are the Lost Bridge North(TA <br /> 3N) and Florian(TA 6)Basins(i.e., investigation basins)which are generally located on the southeast and <br /> west central sides of the city,respectively. Lost Bridge North includes approximately 8.5 miles of <br /> separate sanitary sewer and 171 manholes serving 620 parcels. Florian includes approximately 4.0 miles <br /> of separate sanitary sewer and 90 manholes serving 470 parcels. It is noted that City of Decatur sanitary <br /> sewers flow into trunk sewers owned by the Sanitary District of Decatur(SDD)and are tributary to the <br /> SDD wastewater treatment plant. <br /> PURPOSE <br /> The following scope of professional services addresses the Sewer Collection System Alternatives Analysis <br /> for the investigation basins as outlined in the ACO. The purpose of the Sewer Collection System <br /> Alternatives Analysis is to develop and evaluate alternatives to eliminate excessive inflow and infiltration <br /> (UI)in the investigation basins causing wet weather related SSOs and property backups. Recommended <br /> actions that take all feasible steps to eliminate excessive 1/1 into the sanitary sewer collection system are <br /> to be considered. As outlined in the ACO,the Alternatives Analysis is to address the following: <br /> 1. Improvements to the existing sewer system, including repairs,rehabilitation or replacement of <br /> sewer pipes(restrictions)or lift stations <br /> 2. Construction of additional sewer conveyance capacity <br /> 3. Construction of storage basins or tanks within the system; and <br /> 4. Actions to reduce private property I/I contributions including private property inflow inspections <br /> (e.g., sump pump inspections)and/or smoke testing <br /> 5. An estimation of the cost of each alternative considered <br /> 6. An estimation of the benefit(in terms of either the 1/I in gallons removed or SSOs and property <br /> backups prevented) <br /> 7. A green infrastructure evaluation that will consider potential green infrastructure measures to help <br /> reduce and/or eliminate sources of UI <br /> Last Revised:05-15-2013 A-1 <br />