I <br /> AD4-1 HOLDING EXISTING POLES <br /> V <br /> ' 4.01 Some existing poles may need to be held by the power company <br /> while we are installing the new main. Are fees to hold poles <br /> waived since this is a City project or is the contractor responsible <br /> ' for paying them? <br /> There has never been a need to hold local power poles. If you feel <br /> 1 this is necessary, include the price for holding a pole in the per <br /> foot cost of the water main installation. <br /> ' AD-5-1 EXISTING UTILITIES <br /> 5.01 Is the proposed running line of the new water main able to be <br /> adjusted to avoid digging in close proximity to the existing gas <br /> main&existing water main? We like to stay at least a couple of <br /> 1 feet away from parallel, existing utilities if possible. <br /> Gas mains are usually installed close to the property line. The new <br /> ' water main is going to generally be in the street so it is not <br /> anticipated to experience a conflict. If a conflict is discovered, the <br /> new water main location can be adjusted to avoid the conflict. <br /> AD-6-1 CULVERT REMOVAL <br /> 6.01 If culverts need to be removed&replaced at the driveways and/or <br /> road crossings,will that be paid for at a unit price or is it <br /> ' incidental? <br /> The water main is on the edge of the paving to avoid culverts. The <br /> removal and replacement of culverts will be incidental to the per <br /> foot cost of the water main installation. <br /> AD-7-1 BID ITEM#41 (PAGE 18) <br /> 7.01 Addendum#1 added Bid Item#41, 8"Line Stop to the bid form. <br /> However,there is already a Bid Item#41 (Mulch,Method 2). <br /> Please advise. <br /> Please include a price for both items. <br />