My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-29 Contract with Burdick Plumbing & Heating 2017 Annual Water Main Replacement
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-29 Contract with Burdick Plumbing & Heating 2017 Annual Water Main Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 11:44:52 AM
Creation date
3/9/2017 2:47:10 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-29
Res Ord Title
Contract with Burdick Plumbing & Heating for 2017 Annual Water Main Replacement City Project 2017-10
Department
Public Works
Approved Date
3/6/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AD-8-1 ALTENATE#1) <br /> For the work at ADM replacing the existing 16"valve: <br /> 7.01 Should we assume Valves A,B,D, &E are functional to shut <br /> down the flow while replacing Valve C? <br /> NO,you can assume there will be no flow before you begin to replace <br /> ' valve C <br /> 7.02 It was mentioned at the Pre-Bid that this work is to be done during <br /> ADM's shutdown but will this work have to be done during the <br /> night/weekend of that shutdown?NO <br /> 7.03 How long can the main be shut down to perform our work? <br /> ' ed during As long as need g the ADM shutdown <br /> ' 7.04 Does the new valve get a vault installed around it or just a valve <br /> box? <br /> rJust a valve box <br /> Please make the proper acknowledgment of addenda#2 on page 15 of your bidding <br /> documents <br /> END OF ADDENDUM NO.2 <br /> Engineering Services Coordinator: <br /> Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.