Laserfiche WebLink
AD-8-1 ALTENATE#1) <br /> For the work at ADM replacing the existing 16"valve: <br /> 7.01 Should we assume Valves A,B,D, &E are functional to shut <br /> down the flow while replacing Valve C? <br /> NO,you can assume there will be no flow before you begin to replace <br /> ' valve C <br /> 7.02 It was mentioned at the Pre-Bid that this work is to be done during <br /> ADM's shutdown but will this work have to be done during the <br /> night/weekend of that shutdown?NO <br /> 7.03 How long can the main be shut down to perform our work? <br /> ' ed during As long as need g the ADM shutdown <br /> ' 7.04 Does the new valve get a vault installed around it or just a valve <br /> box? <br /> rJust a valve box <br /> Please make the proper acknowledgment of addenda#2 on page 15 of your bidding <br /> documents <br /> END OF ADDENDUM NO.2 <br /> Engineering Services Coordinator: <br /> Date: <br />