Laserfiche WebLink
Green Oak Pump Station <br /> The Green Oak Pump Station was originally built in 1971 and replaced in 1993 to serve the Greendell <br /> Subdivision on the City's northwest side (See Exhibit Q. The pump station is owned by the City of <br /> Decatur and maintained under contract by the Sanitary District of Decatur. The station is located <br /> near the intersection of Green Oak Drive and Suzan Drive and discharges into a cast iron force main <br /> which runs along Suzan Drive to a City sewer located in Valley Drive. The force main was not <br /> replaced at the time the pump station was replaced, and is now 45 years old. Over the past few years, <br /> the force main has experienced 3 breaks which signals the need to either rehabilitate or replace the <br /> line. The pump station is still in good condition and is not planned for replacement at this time. <br /> Project Letting <br /> The project plans and specifications were prepared by Bainbridge, Gee, Milanski &Associates, Inc. <br /> (BGM). The project includes the replacement of the Starr Crest Pump Station and Force Main, Shore <br /> Oak Pump Station, and Green Oak Force Main. The project was advertised on January 18, 2017, a <br /> pre-bid meeting was held on February 1, 2017 and bids were opened on February 16, 2017. The <br /> results of the letting are as follows (bid tabulation attached): <br /> Compared to <br /> Engineer's Estimate <br /> Bidder Bid Price Over (-Under) <br /> Burdick Plumbing and Heating Co,Inc. $518,271.00 (34.81%) <br /> Kinney Contactors,Inc $518,500.00 (34.78%) <br /> Entler Excavating Co, Inc $717,090.00 (9.80%) <br /> Engineer's Estimate $795,000.00 ---------- <br /> Burdick Plumbing and Heating Co., Inc. provided the lowest responsible bid for the proposed work. <br /> Burdick is a local plumbing and mechanical contractor and has completed several projects of this <br /> type for the City. BGM has investigated their work record and has provided a recommendation, <br /> (attached), stating that Burdick Plumbing and Heating Co, Inc. is able to complete the work as <br /> specified. <br /> Minority Participation Goals <br /> Contractors for City Projects shall comply with City Code Chapter 28, Article 10, "Minority <br /> Participation Goals for Public Works Contracts." <br /> Contractors for City projects shall make a good faith effort to comply with the following minimum <br /> goals: <br /> 1. Ten(10)percent of the total dollar amount of the contract should be performed by Minority <br /> Business Enterprises (MBE) if subcontracting opportunities are available; and, <br /> 2. Eighteen(18)percent of the total hours worked should be performed by minority workers. <br /> Burdick Plumbing and Heating submitted documentation stating that they will meet the MBE <br /> Subcontracting goal of 10%. <br /> — 3 — <br />