My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-34 Contract with Browning Chapman, LLC for Parking Garages B & C CP 2015-03
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-34 Contract with Browning Chapman, LLC for Parking Garages B & C CP 2015-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 9:08:21 AM
Creation date
3/23/2017 9:42:14 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-34
Res Ord Title
Contract with Browning Chapman, LLC, for Parking Garages B & C Structural Improvements City Project 2015-03
Department
Public Works
Approved Date
3/20/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> earl <br /> Walker MEETING MINUTES <br /> 7.0 TESTING <br /> 1 A. As required by the technical specifications and contracted by the General Contractor. <br /> 1 <br /> 8.0 RECORD DOCUMENTS <br /> 1 A. As-built drawings by hand is acceptable. <br /> B. An electronic copy of the As-built drawing is also required. <br /> 1 9.0 EXISTING CONDITIONS WALK-THROUGH <br /> ' A. After the meeting inside the City's administrative offices,the group reconvened in Parking Structure C. <br /> 1. Engineer identified specific locations(examples) of supplemental bearing support, restoring w- <br /> shape web, structural steel maintenance repairs, clean and paint steel beams and decking, and <br /> ' replacing floor drains. <br /> B. After the meeting inside Parking Structure C,the group reconvened in Parking Structure B. <br /> 1. Engineer identified specific locations(examples)of concrete ceiling,joist, beam,and spandrel <br /> (exterior) repairs; masonry brick repairs, and location of the supplementary drain area. <br /> 1 2. Contractor asked about spandrel beam repairs(exterior). Where boom equipment will have to be <br /> located on the street and not on the sidewalk. <br /> 3. Pedestrian closure of a sidewalk will be allowed. <br /> 4. EI Dorado street is a US Highway and construction equipment there will require a greater effort <br /> than those of the other streets. <br /> 5. Masonry repairs will be in coordination with the Engineer. Accessing areas to observe conditions <br /> 1 behind the brick wythe will aid in further directions for repairs. <br /> 2.0 NEW BUSINESS <br /> 1 1. None. <br /> 1 <br /> 1 <br /> 1 <br /> RESTORATION&ORESERVATION Solutions Page 3 of 3 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.