R2017-34 Contract with Browning Chapman, LLC for Parking Garages B & C CP 2015-03
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-34 Contract with Browning Chapman, LLC for Parking Garages B & C CP 2015-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 9:08:21 AM
Creation date
3/23/2017 9:42:14 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-34
Res Ord Title
Contract with Browning Chapman, LLC, for Parking Garages B & C Structural Improvements City Project 2015-03
Department
Public Works
Approved Date
3/20/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C:arl <br /> Wa I k er- MEETING MINUTES <br /> F. The project includes waterproofing repairs and applications, and painting steel. <br /> 4.0 ALTERNATES:(Combines Garages B and Q <br /> A. The extensive use of Alternate tables is so that the City can repair as much of the structure as possible. <br /> The City will select sets of alternates that best serves the structure and is within budget. <br /> 5.0 REVIEW OF GENERAL CONDITIONS <br /> A. Insurance and Bonds,see the solicitation/specification. <br /> B. Permits, not required. <br /> ! C. Security, some coordination is required with the tenant in Parking Structure B. <br /> D. Request for Information will be sent to the Engineer. <br /> ! E. Change Order Procedures, proposals for the change orders will be coordinated with the Owner and sent <br /> to the Engineer who will develop an independent government estimate and submit both to the City. <br /> ! F. Project Schedule; <br /> 1. Notice to Proceed is expected to be issued by the 3'd week of March <br /> 2. Substantial Completion is by July 31. <br /> 3. Work noise is acceptable after 7 AM. <br /> 4. Contractor may obtain 25% of Parking Structure B maximum at any one time for work. <br /> 5. Contractor may obtain 50%of Parking Structure C maximum at any one time for work. <br /> G. Application for Payment, seethe solicitation/specification for the method specific to the City. <br /> ! 1. Project requires progressive as built drawings electronically,that distinguishes that month's <br /> application from previous applications <br /> H. Construction Facilities, storage, and parking is allowed within the contractor work zone. <br /> 1. Dumpster can be located in a street, coordination with the City will be required. <br /> I. Conflict Resolution <br /> 1. The project is a 3-member team;the Owner, Engineer,and Contractor. For conflicts,the Engineer <br /> or Owner are to assist through the conflict, seeking a win-win-win solution if possible. <br /> 6.0 SAFETY REPORT <br /> A. Utility Interruption,a planned interruption is not anticipated for the project. <br /> ! <br /> RESTORATION&(PRESERVATION Solutions Page 2 of 3 <br /> ! <br />
The URL can be used to link to this page
Your browser does not support the video tag.