My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-53 Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Project CP 2012-22
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-53 Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Project CP 2012-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 9:35:18 AM
Creation date
4/19/2017 2:39:30 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-53
Res Ord Title
Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Separation Project CP 2012-22
Department
Public Works
Approved Date
4/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLANK, WESSELINK, COOK <br /> • <br /> AND ASSOCIATES, INC. <br /> ENGINEERS <br /> CONSULTANTS Joseph D.Cycotte <br /> Scott D.Righter <br /> Project Project No. - <br /> ' � Nelson Park Neighborhood � t BWC 009 1503 Meeting Date <br /> Combined Sewer Separation City 2012-22 3/2/2017 <br /> Project <br /> ' 7. Discussed the intermediate completion date of July 15, 2017 to complete the work through the <br /> Nelson Park Parking Lot. The contractors expressed some concern about materials arriving on <br /> time to finish the required work by this date. BWC and the City of Decatur discussed some <br /> ' options including asking IDOT approved concrete pipe suppliers about time frames to have <br /> materials delivered to site and possible partial award of contract to complete this intermediate <br /> work. BWC contacted County Materials Corp. out of Charleston, IL who advised that delivery <br /> ' of materials to Decatur should be within 1 week after the orders are signed and complete. <br /> 8. Discussed other documentation, progress payments, waivers, and qualifications described in <br /> ' Item VIII in the Pre-Bid Meeting Outline. The City Noted that no arrangements have been <br /> made to specify a lay down or storage area and that the contractor shall make arrangements at <br /> his own discretion. The City also stressed scheduling work so all work areas are paved prior to <br /> winter shutdown and that paving must be completed within 4 weeks of shutdown. The City <br /> ' also discussed traffic control planning so no more than 1 intersection is blocked at a time and <br /> access to driveways must be open by the end of each day. <br /> 9. Discussed tentative schedule dates. The Bid Opening is planned for March 30, 2017 at 10:30 <br /> AM. Notice of award is planned for approximately June 1, 2017. Intermediate Contract <br /> Completion is July 15, 2017 and final Contract Completion is October 31, 2018. Each bidder <br /> must advertise for DBE's 16 days prior to the bid opening. <br /> ' Page 2 of 2 <br /> 2623 EAST PERSHING ROAD • P.O.BOX 2910 • DECATUR,IL 62524-2910 <br /> ' PHONE 217-428-0973 • FAX 217-428-8934 <br /> BWC#510-1(i(08/03) <br />
The URL can be used to link to this page
Your browser does not support the video tag.