My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-53 Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Project CP 2012-22
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-53 Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Project CP 2012-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 9:35:18 AM
Creation date
4/19/2017 2:39:30 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-53
Res Ord Title
Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Separation Project CP 2012-22
Department
Public Works
Approved Date
4/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL SPECIFICATIONS &SPECIAL PROVISIONS <br /> Nelson Park Neighborhood Combined Sewer Separation Project <br /> City of Decatur, Illinois <br /> City Project 2012-22/IEPA Loan L17-5315 <br /> TECHNICAL SPECIFICATIONS AND SPECIAL PROVISIONS <br /> TABLE OF CONTENTS <br /> ' INTRODUCTORY PARAGRAPH..............................................................................................126 <br /> INTENT OF PROJECT STATEMENT.......................................................................................126 <br /> DESCRIPTIONOF WORK.......................................................................................................126 <br /> STATUSOF UTILITIES............................................................................................................127 <br /> ' COMPLETION DATE PLUS WORKING DAYS........................................................................128 <br /> SCHEDULEOF WORK............................................................................................................128 <br /> TRAFFIC CONTROL PLAN......................................................................................................130 <br /> ' TREE REMOVAL (OVER 15 UNITS DIAMETER)....................................................................131 <br /> TRENCHBACKFILL.................................................................................................................131 <br /> TEMPORARY EROSION CONTROL SEEDING......................................................................132 <br /> ' SECTION 352: SOIL—CEMENT BASE COURSE..................................................................132 <br /> HOT MIX ASPHALT MIXTURE REQUIREMENTS...................................................................134 <br /> TRUCK LOADING TO REDUCE MIX SEGREGATION............................................................135 <br /> BITUMINOUS MATERIALS (TACK COAT)..............................................................................135 <br /> CLASSD PATCHES.................................................................................................................135 <br /> TYPE8 GRATE ........................................................................................................................135 <br /> ADJUSTWATER MAIN............................................................................................................136 <br /> ADJUSTING SANITARY SEWERS (8" DIAMETER OR LESS) ...............................................136 <br /> VALVE BOXES TO BE REPLACED.........................................................................................136 <br /> FILLING EXISTING CULVERTS...............................................................................................137 <br /> ' PRUNING FOR SAFETY AND EQUIPMENT CLEARANCE....................................................137 <br /> STORM SEWER TO BE FILLED..............................................................................................137 <br /> PLUGEXISTING DRAINS........................................................................................................138 <br /> BOLLARDREMOVAL...............................................................................................................138 <br /> ' HOT-MIX ASPHALT SURFACE REMOVAL, SPECIAL............................................................138 <br /> STORMSEWER REMOVAL ....................................................................................................139 <br /> REMOVING MANHOLES, SPECIAL........................................................................................139 <br /> HOT-MIX ASPHALT DRIVEWAY PAVEMENT, 3" ...................................................................139 <br /> CONSTRUCTION LAYOUT......................................................................................................140 <br /> STORM SEWER 12", SPECIAL................................................................................................141 <br /> STORM SEWER (WATER MAIN QUALITY PIPE)...................................................................142 <br /> ' CONCRETE RETAINING WALL REMOVAL............................................................................144 <br /> TELEVISION INSPECTON OF SEWER, SPECIAL..................................................................145 <br /> COFFERDAMS (SPECIAL) ......................................................................................................146 <br /> ' ROCK FILL ...............................................................................................................................146 <br /> STORM WATER POLLUTION PREVENTION PLAN ..............................................................147 <br /> ' 009-1503 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.