My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-53 Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Project CP 2012-22
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-53 Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Project CP 2012-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 9:35:18 AM
Creation date
4/19/2017 2:39:30 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-53
Res Ord Title
Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Separation Project CP 2012-22
Department
Public Works
Approved Date
4/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL SPECIFICATIONS&SPECIAL PROVISIONS <br /> Nelson Park Neighborhood Combined Sewer Separation Project <br /> City of Decatur, Illinois <br /> City Project 2012-22/IEPA Loan L17-5315 <br /> ' COMPLETION DATE PLUS WORKING DAYS <br /> It is the City's intent that the project be completed by October 31. 2018, with five additional <br /> ' working days allowed for final seeding and cleanup of the project area. <br /> The provisions for the completion date shall be as set forth in Section 108 Prosecution and <br /> Progress of the Standard Specifications. All Applicable provisions of Section 108 shall apply. <br /> If the project is not complete, as described above, the Contractor shall be liable and shall pay <br /> ' to the City the amount per calendar day shown in the table in GC-13 and Article 108.09, and <br /> based on the full awarded value of the contract, not as penalty but as liquidated damages, for <br /> each day of overrun in the contract time or such extended time as may have been allowed. <br /> ' An intermediate completion date of 35 Calendar Days from the Date of the Notice to <br /> Proceed has been established to complete the south portion of the storm sewer <br /> through the proposed Nelson Park parking lot expansion as shown on the plans. If this <br /> ' portion of the project is not complete, the Contractor shall be liable and shall pay to the City <br /> the amount per calendar day shown in the table in GC-13 and Article 108.09, and based on the <br /> combined unit prices of the bid items for this portion of the work, not as penalty but as <br /> ' liquidated damages, for each day of overrun in the contract time or such extended time as may <br /> have been allowed. This work will only be considered complete when all of the required pipe <br /> has been installed at the proper slope and backfilled with compacted CA-6 to the grade of the <br /> ' adjacent ground and accepted by the Engineer. Lake Shore Drive can be closed at the <br /> crossing. The headwall and sidewalk work at the lake can be completed outside of the 35 <br /> Calendar Day requirement. Pavement will not be restored through the existing parking lot and <br /> adjacent street areas. <br /> SCHEDULE OF WORK <br /> ' The Contractor shall submit a staging plan to the Engineer for approval prior to starting <br /> construction. The staging plan should indicate anticipated duration for each construction <br /> operation and the length of time entrances may be closed. Specific target dates indicated in <br /> the plans for roadway closure shall be shown in the staging plan. <br /> The Contractor and All Sub-Contractors shall furnish in writing, or electronic form, a weekly <br /> schedule by 12:00 P.M., Thursday, prior to the week being scheduled, so all media, safety <br /> services and other City of Decatur Divisions can be notified. All work shall be approved by the <br /> Engineer. <br /> The Contractor shall designate a liaison to work with the affected property owners to keep them <br /> updated regarding the project status and schedule. All property owners who are, or will be <br /> ' affected by the project within the coming week are to be informed of the construction schedule <br /> a week in advance. <br /> To facilitate minimal disturbance to the neighborhood during the winter construction shut down <br /> period, construction of the storm sewer may not proceed beyond areas that can be fully <br /> 009-1503 128 <br />
The URL can be used to link to this page
Your browser does not support the video tag.