' P. The following pollutants of concern will be associated with this construction project: <br /> ® Soil Sediment ® Petroleum (gas, diesel, oil, kerosene, hydraulic oil/fluids) <br /> ' ® Concrete ® Antifreeze/Coolants <br /> ® Concrete Truck Waste ® Waste water from cleaning construction equipment <br /> ® Concrete Curing Compounds ❑ Other(specify) <br /> ® Solid Waste Debris ❑ Other(specify) <br /> ' ❑ Paints ❑ Other(specify) <br /> ❑ Solvents ❑ Other(specify) <br /> ® Fertilizers/Pesticides ❑ Other(specify) <br /> II. Controls: <br /> This section of the plan addresses the controls that will be implemented for each of the major construction activities <br /> described in I.C. above and for all use areas, borrow sites, and waste sites. For each measure discussed, the Contractor <br /> will be responsible for its implementation as indicated. The Contractor shall provide to the Resident Engineer a plan for <br /> the implementation of the measures indicated. The Contractor, and subcontractors, will notify the Resident Engineer of <br /> ' any proposed changes, maintenance, or modifications to keep construction activities compliant with the Permit ILR10. <br /> Each such Contractor has signed the required certification on forms which are attached to, and are a part of, this plan: <br /> A. Erosion and Sediment Controls:At a minimum, controls must be coordinated, installed and maintained to: <br /> ' 1. Minimize the amount of soil exposed during construction activity; <br /> 2. Minimize the disturbance of steep slopes; <br /> 3. Maintain natural buffers around surface waters, direct storm water to vegetated areas to increase sediment <br /> ' removal and maximize storm water infiltration, unless infeasible; <br /> 4. Minimize soil compaction and, unless infeasible, preserve topsoil. <br /> ' B. Stabilization Practices: Provided below is a description of interim and permanent stabilization practices, including <br /> site-specific scheduling of the implementation of the practices. Site plans will ensure that existing vegetation is <br /> preserved where attainable and disturbed portions of the site will be stabilized. Stabilization practices may include <br /> but are not limited to: temporary seeding, permanent seeding, mulching, geotextiles, sodding,vegetative buffer <br /> ' strips, protection of trees, preservation of mature vegetation, and other appropriate measures. Except as provided <br /> below in II(B)(1)and Il(B)(2), stabilization measures shall be initiated immediately where construction activities <br /> have temporarily or permanently ceased, but in no case more than one(1)day after the construction activity in that <br /> portion of the site has temporarily or permanently ceases on all disturbed portions of the site where construction will <br /> not occur for a period of fourteen (14)or more calendar days. <br /> 1. Where the initiation of stabilization measures is precluded by snow cover, stabilization measures shall be <br /> initiated as soon as practicable. <br /> I2. On areas where construction activity has temporarily ceased and will resume after fourteen (14) days, a <br /> temporary stabilization method can be used. <br /> The following stabilization practices will be used for this project: <br /> ® Preservation of Mature Vegetation ® Erosion Control Blanket/Mulching <br /> ❑ Vegetated Buffer Strips ® Sodding <br /> ® Protection of Trees ❑ Geotextiles <br /> ® Temporary Erosion Control Seeding ❑ Other(specify) <br /> ❑ Temporary Turf(Seeding, Class 7) ❑ Other(specify) <br /> ® Temporary Mulching ❑ Other(specify) <br /> ® Permanent Seeding ❑ Other(specify) <br /> 1 <br /> Page 3 <br />